Tender Details
Particulars | Details |
---|---|
Title |
Preparing Detailed Project Report For Construction Of Water Harvesting And Storage Structure At Leh Nallah For Preparation Of Dp Rs Of Minor Irrigation ,Flood Protection And Water Storage/Conservation Project In Leh Nallah Under Irrigation And Flood C
|
Description |
Preparing Detailed Project Report For Construction Of Water Harvesting And Storage Structure At Leh Nallah For Preparation Of Dp Rs Of Minor Irrigation ,Flood Protection And Water Storage/Conservation Project In Leh Nallah Under Irrigation And Flood C
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2024_PWD_14802_1 |
Reference Number |
49 of I and FC Division Leh 2024-25 |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | LEH |
Link | https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=37145 |
Start Date | November 18, 2024 23:30 |
End Date |
26/11/2024 ( Expired 173 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreProvn of arrangement of gutter pipes and down pipes to a collected tank for discontinuation of free falling water from roof top and roof top rain water harvesting (rwh) at inhs dhanvantari under ge minnie bay, sri vijaya puram
(8577/e8) provn of arrangement of gutter pipes and down pipes to a collected tank for discontinuation of free falling water from roof top and roof top rain water harvesting (rwh) at inhs dhanvantari under ge minnie bay, sri vijaya puram
Read moreRepairs to joinery flooring sanitary fittings and other misc br work in toilets block of certain bldgs at adm bldgs areas of hq centre under age br meg of ge north bangalore
Repairs to joinery flooring sanitary fittings and other misc br work in toilets block of certain bldgs at adm bldgs areas of hq centre under age br meg of ge north bangalore
Read moreFlood protection concrete bund at brog lungma nallah wakha for 515 mtr length on both side of nallah under the project of flood protection bund at brog lungma and fokar lungma
Flood protection concrete bund at brog lungma nallah wakha for 515 mtr length on both side of nallah under the project of flood protection bund at brog lungma and fokar lungma
Read moreConstruction of various drilling locations including preparation of plinths, campsites, foundation castings and other miscellaneous civil works including minor building and structure work in and around baghewala, dandewala, oalp blocks, dsf blocks area of jaisalmer, bikaner and phalodi districts of rajasthan for a period of 2 years 25 27 phase ii
Construction of various drilling locations including preparation of plinths, campsites, foundation castings and other miscellaneous civil works including minor building and structure work in and around baghewala, dandewala, oalp blocks, dsf blocks area of jaisalmer, bikaner and phalodi districts of rajasthan for a period of 2 years 25 27 phase ii
Read moreAddn altn of wk of bldg no t-26 and t-28 provn of tiling and false ceiling in bldg no. owt-678, owt-680 and owt-681 and provn of 04 water cooler for certain unit at likabali mil stn under ge 872 ews
Addn altn of wk of bldg no t-26 and t-28 provn of tiling and false ceiling in bldg no. owt-678, owt-680 and owt-681 and provn of 04 water cooler for certain unit at likabali mil stn under ge 872 ews
Read moreSupply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Read moreof your Industry type