Tender Details

About Tender

🏨 Procurement Opportunity: Hotel Accommodation For Indian Naval Sailors 🚢🏨 Cochin Shipyard Limited, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids For The Provision Of Hotel Accommodation To Sailors Of An Indian Naval Vessel Based In Kochi. 📅 Bid Submission Deadline: April 25, 2024, 3:00 Pm This Tender Is Open To All Eligible Entities Capable Of Providing Comfortable And Secure Accommodation For The Sailors. Proposals Should Detail The Range Of Services, Amenities, And Rates, Along With The Capacity To Accommodate The Expected Number Of Sailors. Keywords: Hotel Accommodation, Indian Naval Sailors, Cochin Shipyard Limited, Central Government, Tender, Kochi
Particulars Details
Title
Hotel Accommodation For Sailors Of An Indian Naval Vessel
Description
Hotel Accommodation For Sailors Of An Indian Naval Vessel
Organisation Cochin Shipyard Limited | Central Govt. Ministry/Department
Tender Id 2024_CSL_753875_1
Reference
Number
CSL/SRP/148/2024
Tender Fee 0
EMD 0
Tender Value
Place Kochi
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1057190

Start Date April 20, 2024 16:30
End Date
Expired 25/04/2024

Expired 819 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Provision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh

Provision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh

Read more
Set of hex head plug screw

For complete deion and other details, please refer to tender

Read more
Consultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k

Consultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Expression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes

Expression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes

Read more
Procurement of control interface module (cim) for 20 cum er shovel

Procurement of control interface module (cim) for 20 cum er shovel

Read more
Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.

Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.

Read more
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.

Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise