Tender Details

Particulars Details
Title
Road Safety Work Of Lucknow Varanasi Road In Km 5 And 6 And 7 And 8 On Occasion Of Organizing Army Day Parade In Lucknow City
Description
Road Safety Work Of Lucknow Varanasi Road In Km 5 And 6 And 7 And 8 On Occasion Of Organizing Army Day Parade In Lucknow City
Organisation Government of Uttar Pradesh
Tender Id 2023_CEUCZ_862133_3
Reference
Number
8004/E-TENDER/2023-24 DATED 07.11.2023
Tender Fee 854
EMD 1.85 Lakh
Tender Value
Place OFFICE OF EE PD PWD LUCKNOW
Link https://etender.up.nic.in
Start Date November 14, 2023 22:30
End Date

25/11/2023 ( Expired 585 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Read more
Work of one time treatment of bypassed portion of dharuhera town on nh 919, ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.

Work of one time treatment of bypassed portion of dharuhera town on nh 919,&#x0d ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.

Read more
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Read more
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Read more
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Read more
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise