Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Footpath, Shoulder, K / C Drain And Painting Work On Footpath Etc. Of Various Road From Under Capital Sub Division No. 6, Cpa.Pwd Bhopal
|
Description |
Repairing Of Footpath, Shoulder, K / C Drain, And Painting Work On Footpath Etc. Of Various Road From Under Capital Sub Division No. 6, Cpa.Pwd Bhopal
|
Organisation | Capital Project Administration | State Govt. and UT |
Tender Id | 2024_CPA_356224_1 |
Reference Number |
16/SAC |
Tender Fee | 2295 |
EMD | 39960 |
Tender Value | |
Place | BHOPAL |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=467432 |
Start Date | January 20, 2025 23:00 |
End Date |
28/01/2025 ( Expired 130 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreSupply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502.
Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreSurface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Read moreA/r and m.o to residential builiding under division no-3 at nabha estate shimla (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )
A/r and m.o to residential builiding under division no-3 at nabha estate shimla&#x0d (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )&#x0d
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of cc road ,drain, and electrification work under n.p. manpur
Construction of cc road ,drain, and electrification work under n.p. manpur
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type