Tender Details
Particulars | Details |
---|---|
Title |
Special Repair (Cc Work) Of Village Sisaua To Gajrani Inter College Link Road In Distt. Shahjahanpur. (Fin Year 2023 24)
|
Description |
Special Repair (Cc Work) Of Village Sisaua To Gajrani Inter College Link Road In Distt. Shahjahanpur. (Fin Year 2023 24)
|
Organisation | Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT |
Tender Id | 2024_CEBLY_903856_1 |
Reference Number |
754/142C(E-Tender)-3/23 Date 23-01-2024 |
Tender Fee | 2725 |
EMD | 4.01 Lakh |
Tender Value | |
Place | SHAHJAHANPUR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1574751 |
Start Date | March 06, 2024 14:30 |
End Date |
12/03/2024 ( Expired 433 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Zonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Zonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Read moreSpecial repair to road from boundary of atuta gate to bigash gate (near line no 06) at mil stn babugarh under ge (north) meerut cantt
Special repair to road from boundary of atuta gate to bigash gate (near line no 06) at mil stn babugarh under ge (north) 
 meerut cantt
Read moreConstruction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Construction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Read moreConstruction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi
Construction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi
Read moreConstruction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Construction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreExecuting work of 66 kv line for stringing of 2nd circuit of 66 kv line from 66 kv substation amloh to 66 kv substation bhadson planning no 80 cz 2023 24 annexure e rdss work
Executing work of 66 kv line for stringing of 2nd circuit of 66 kv line from 66 kv substation amloh to 66 kv substation bhadson planning no 80 cz 2023 24 annexure e rdss work
Read moreConstruction of cc road at ward 30 gokuldham colony in deepak updhay house to tikam manloi house.
Construction of cc road at ward 30 gokuldham colony in deepak updhay house to tikam manloi house.
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreof your Industry type