Tender Details

Particulars Details
Title
Construction Work Of 07 07 Meter Wide Service Road On Both Sides Of 04 Lane Yamuna Expressway To Vrindavan (Pagal Baba Temple) Road Chainage 0.000 To 3.500 In District Mathura
Description
Construction Work Of 07 07 Meter Wide Service Road On Both Sides Of 04 Lane Yamuna Expressway To Vrindavan (Pagal Baba Temple) Road Chainage 0.000 To 3.500 In District Mathura
Organisation Chief Engineer Agra Zone PWD Agra UP | State Govt. and UT
Tender Id 2025_CEAGR_1016612_1
Reference
Number
6383/14M-AC/2024-25 dated 09-12-2024
Tender Fee 2354
EMD 30 Lakh
Tender Value
Place Mathura
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1849068
Start Date April 02, 2025 15:30
End Date

11/04/2025 ( Expired 11 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Read more
Construction of champawat bypass with two lane with paved shoulder configuration ing from existing chainage 121.700 to existing chainage 129.450 (design length 9.847) of nh-125 in district-champawat in the state of uttrakhand on epc

Construction of champawat bypass with two lane with paved shoulder configuration ing from existing chainage 121.700 to existing chainage 129.450 (design length 9.847) of nh-125 in district-champawat in the state of uttrakhand on epc

Read more
Widening and strengthening work of 04 lane road from the main gate of maa pateshwari devi temple to balrampur sugar mill in tulsipur vidhan sabha of balrampur district

Widening and strengthening work of 04 lane road from the main gate of maa pateshwari devi temple to balrampur sugar mill in tulsipur vidhan sabha of balrampur district

Read more
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Read more
Ward no. 125 sector-8 bt road work on both sides of mahavir park, from panchsheel to shamshan

Ward no. 125 sector-8 bt road work on both sides of mahavir park, from panchsheel to shamshan

Read more
Construction of road and drain work (2.00 km) from sidcul to the project site for the construction residential project at anneki-hetampur in haridwar district under pradhan mantri awas yojana (urban). (chainage 3.550 to 5.250)

Construction of road and drain work (2.00 km) from sidcul to the project site for the construction residential project at anneki-hetampur in haridwar district under pradhan mantri awas yojana (urban). (chainage 3.550 to 5.250)

Read more
Interlocking tile work on both sides of carriageway for road safety (black spot id no. up-(04)-49) from ch. 66.000 to ch. 69.000 (urban stretch of attara) of nh-35 (old nh-76) in the state of uttar pradesh.

Interlocking tile work on both sides of carriageway for road safety (black spot id no. up-(04)-49) from ch. 66.000 to ch. 69.000 (urban stretch of attara) of nh-35 (old nh-76) in the state of uttar pradesh.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise