Tender Details
Particulars | Details |
---|---|
Title |
Periodical Services And Connected Works In Zone Iii And Zone Iv Area Under Age B/R Ii Of Ge (I) Kanpur
|
Description |
Periodical Services And Connected Works In Zone Iii And 
Zone Iv Area Under Age B/R Ii Of Ge (I) Kanpur
|
Organisation | E-IN-C BRANCH - MILITARY ENGINEER SERVICES | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 500 |
EMD | 96000 |
Tender Value | |
Place | KANPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | June 09, 2025 20:30 |
End Date |
16/06/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read morePackage iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreImplementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b (neres-xxv part-b)
Read moreCs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreof your Industry type