Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ytps
|
| Description |
Tggenco Ytps (5x800 Mw) Stage 1 Unit 1 Boiler Loading, Transportation, Unloading And Cleaning Of Mill Rejects Coal, Debris And Coal From Feeder Floor Area, Mill Pits, Mill Surrounding Area At Zero Meter And Dumping At The Designated Area Earmarked In The Coal Plant On As And When Required Basis From 01.04.2026 To 31.03.2027, To Be Reckoned From The Actual Date Of Commencement.
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 695371 |
|
Reference Number |
e-24/ SE/ EM/Stage-I/ YTPS/2026-27 |
| Tender Fee | 524 |
| EMD | 22201 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | April 20, 2026 23:30 |
| End Date |
Expired
24/04/2026
Expired 176 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreTggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Read moreTggenco-ytps-upkeeping and maintenance of toilets in ash handling plant structures including silos at ytps from 01.04.2026 or actual date of utilization to 31.03.2027
Tggenco-ytps-up keeping and maintenance of toilets in ash handling plant structures including silos of yadadri thermal power station at veerlapalem(v), dameracherla(m), nalgonda dist from 01.04.2026 or actual date of utilization to 31.03.2027 for the fy 2026-27
Read moreTggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe line and manholes at office sheds and store office building at ytps from 01.04.2026 or actual date of commencement of work to 31.03.2027.
Tggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes at various locations in office sheds and store office building of yadadri thermal power station, at veerlapalem(v), dameracherla(m) in nalgonda dist from 01.04.2026 or actual date of commencement of work to 31.03.2027
Read moreTggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes at power house 1 and 2, esp control building-1 and 2 and service building 1 at ytps from 01.04.2026 or actual date of commencement of work to 31.03.2027
Tggenco-ytps(5x800mw)-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes etc at power house-1 and 2, esp control building-1 and 2 and service building-1 at yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda district from 01.04.2026 or actual date of commencement of work to 31.03.2027.
Read moreTtps operation circle mpm ii unit v collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2026 to 31.03.2027
Ttps operation circle mpm ii unit v collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2026 to 31.03.2027
Read moreTtps operation circle mpm ii unit iv collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2026 to 31.03.2027
Ttps operation circle mpm ii unit iv collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at ttps from 01.04.2026 to 31.03.2027
Read moreTtps operation circle mpm i unit iii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2026 to 31.03.2027
Ttps operation circle mpm i unit iii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2026 to 31.03.2027
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreTtps operation circle mpm i unit iii upkeepment, cleaning of mills, mill floor and leak arresting in mills and coal pipes from mills to boiler for the period from 01.04.2026 to 31.03.2027
Ttps operation circle mpm i unit iii upkeepment, cleaning of mills, mill floor and leak arresting in mills and coal pipes from mills to boiler for the period from 01.04.2026 to 31.03.2027
Read moreof your Industry type