Tender Details

Particulars Details
Title
Transformer Work And 11 Kv Lt Line Work At New Trenching Ground In Ward 10
Description
Transformer Work And 11 Kv Lt Line Work At New Trenching Ground In Ward 10
Organisation Directorate Urban Administration and Development | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 2295
EMD 10800
Tender Value
Place Khategaon
Link

AAAAAAAAAA

Login to view
Start Date June 05, 2025 14:30
End Date

07/07/2025 ( 3 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work

Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Licensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document

Licensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical &#x0d college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document

Read more
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.

Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.

Read more
Agar-09

Licensing of co-branding and inside advertising rights of five (5) no. metro stations of agra metro rail-priority &#x0d corridor in upmrc network as per scope of work mentioned in tender

Read more
Total 28 shop buit on new bus stand shopping complex, ward no. 10, barghat, seoni shop no - 39

Total 28 shop buit on new bus stand shopping complex, ward no. 10, barghat, seoni shop no - 39

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise