Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Sample Cup,Total And Direct Bilirubin Estimation Kit Based On Diazotized Sulphanilic Acid Method. (
|
Description |
|
Organisation | Health & Family Welfare Department Gujarat | |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | 2 Crore |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | July 02, 2025 17:22 |
End Date |
23/07/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Read moreDesign, construction, supply, installation and commissioning of package type sewerage treatment plant (based on mbr technology) within power plant area of chandrapura thermal power station on epc basis
Design, construction, supply, installation and commissioning of package type sewerage treatment plant (based on mbr technology) within power plant area of chandrapura thermal power station on epc basis
Read moreSdn based network switches for 10gbps intranet and internet network total 10 items
Sdn based network switches for 10gbps intranet and internet network total 10 items
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreBalance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.
Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.
Read moreDesign, survey, engg, constr., supply, erection, testing and commissioning of 12 mld sewerage treatment plant cum water reclamation facility at tech zone it city, gr. noida based on sbr technology including o and m for 120 months.
Design, survey, engg, constr., supply, erection, testing and commissioning of 12 mld sewerage treatment plant cum water reclamation facility at tech zone it city, gr. noida based on sbr technology including o and m for 120 months.
Read moreEstablishment installation commissioning trial run and operational training etc complete of half tph capacity three nos seed processing plant based on paddy at bijoynagar west tripura district panisagar north tripura district and jagannathpur unokoti
Establishment installation commissioning trial run and operational training etc complete of seed processing plant based on paddy at bijoynagar west tripura district panisagar north tripura district and jagannathpur unokoti district
Read moreConstruction installation trial run and commissioning of three nos desiccant dehumidification system for 200 mt capacity dehumidified godown based on paddy at bijoynagar under west tripura district panisagar under north tripura district and jagannath
Construction installation trial run and commissioning of desiccant dehumidification system for 200 mt capacity dehumidified godown at bijoynagar under west tripura district panisagar under north tripura district and jagannath under unokoti district
Read moreof your Industry type