Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Hl Bridge Over River Genguti Nallah At 11.00 Km On Nuabandha To Aradi Via Maturigada Ps Road In The District Of Bhadrak
|
| Description |
Construction Of Hl Bridge Over River Genguti Nallah At 11.00 Km On Nuabandha To Aradi Via Maturigada Ps Road In The District Of Bhadrak Under Bsy For The Year 2022 23
|
| Organisation | Government of Odisha |
| Tender Id | 2023_CERWI_95200_1 |
|
Reference Number |
Tender Online-07/2023-24 ( Bridges) |
| Tender Fee | 10000 |
| EMD | 10.46 Lakh |
| Tender Value | |
| Place | Office of EIC RW Odisha Bhubaneswar |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | October 05, 2023 19:30 |
| End Date |
Expired
19/10/2023
Expired 990 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read more1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Read moreConstruction of a drain and road in saurabh nagar located on gram dahtaura road, extending from shri munesh salon to shri vijay kumar pandits house.
Construction of a drain and road in saurabh nagar located on gram dahtaura road, extending from shri munesh salon to shri vijay kumar pandits house.
Read moreConstruction of cc road from gandhi chowk to sri siddeshwar temple in vijaypur city limits of vijaypur district. (including construction of duct, drain, foot-path and model street lighting)
Construction of cc road from gandhi chowk to sri siddeshwar temple in vijaypur city limits of vijaypur district. (including construction of duct, drain, foot-path and model street lighting)
Read moreof your Industry type