Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Completion Of Preconstruction Activities Land Acquisition, Forest Clearances And Utility Shifting For The Work Widening To 4 Lane Ps From Km 67.200 To Km 108.542 Of Sironcha Atmakur Section Of Nh 353 C In Telangana
|
| Description |
Consultancy Services For Completion Of Preconstruction Activities Land Acquisition, Forest Clearances And Utility Shifting For The Work Widening To 4 Lane Ps From Km 67.200 To Km 108.542 Of Sironcha Atmakur Section Of Nh 353 C In Telangana
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_833301_1 |
|
Reference Number |
SE R and B NH WGL222024-25, Dt.30.10.2024 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | |
| Place | Telangana |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=875657 |
| Start Date | October 31, 2024 17:30 |
| End Date |
Expired
07/11/2024
Expired 596 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb
Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConsultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k
Consultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for completion of preconstruction activities land acquisition, forest clearances and utility shifting for the work widening to 4 lane ps from km 67.200 to km 108.542 of sironcha atmakur section of nh 353c in telangana
Consultancy services for completion of preconstruction activities land acquisition, forest clearances and utility shifting for the work widening to 4 lane ps from km 67.200 to km 108.542 of sironcha atmakur section of nh 353c in telangana
Read moreof your Industry type