Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Dpr Preparation For Widening To 2 Lane With Paved Shoulder From Km 30 To 57 Of Nh 333 A In The State Of Jharkhand On Epc Mode Including Bridges, Land Acquisition, Forest Clearance And Utility Shifting Etc.
|
| Description |
Consultancy Services For Dpr Preparation For Widening To 2 Lane With Paved Shoulder From Km 30 To 57 Of Nh 333 A In The State Of Jharkhand On Epc Mode Including Bridges, Land Acquisition, Forest Clearance And Utility Shifting Etc.
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_822383_1 |
|
Reference Number |
NH/Deoghar/03/2024-25 |
| Tender Fee | 10000 |
| EMD | 2 Lakh |
| Tender Value | - |
| Place | Deoghar |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=864233 |
| Start Date | August 23, 2024 23:05 |
| End Date |
Expired
20/09/2024
Expired 754 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bypasses at sheikhpura and khaira along with 1 no. of realignment at sikandra to two lane with paved shoulders standard on n.h. 333a under epc mode in state of bihar (job no. nh-333a-2022-23-br-58).
Construction of bypasses at sheikhpura and khaira along with 1 no. of realignment at sikandra to two lane with paved shoulders standard on n.h. 333a under epc mode in state of bihar (job no. nh-333a-2022-23-br-58).
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreUpgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Upgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreWidening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Read moreConst. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Read moreWidening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreof your Industry type