Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Of Drain And Cc Road From Sahabuddin House To Master House In Ward 14 Of Extended Area Of Nagar Panchayat Obra
|
| Description |
Work Of Drain And Cc Road From Sahabuddin House To Master House In Ward 14 Of Extended Area Of Nagar Panchayat Obra
|
| Organisation | Directorate of Local Bos UP | State Govt. and UT |
| Tender Id | 2024_DOLBU_944059_1 |
|
Reference Number |
211/NPPOBRA/18/07/2024 |
| Tender Fee | 800 |
| EMD | 14200 |
| Tender Value | |
| Place | Nagar Panchyat Obra |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1634697 |
| Start Date | August 06, 2024 20:00 |
| End Date |
Expired
12/08/2024
Expired 708 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.
Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreWork of nali and cc road from sahabuddin house to master house in ward no. 14 vistarit area of n.p. obra.
Work of nali and cc road from sahabuddin house to master house in ward no. 14 vistarit area of n.p. obra.&#x0d
Read moreOnstruction work of covered rcc drain and cc road from next to the house of kuber kutir ganesh srivastava to umesh chaurasia house in ward 18, extended area of n.p. obra, in progress.
Onstruction work of covered rcc drain and cc road from next to the house of kuber kutir ganesh srivastava to umesh chaurasia house in ward 18, extended area of n.p. obra, in progress.
Read moreConstruction work of rcc drain and coloured interlocking road from vinod gupta house to pwd road in ward 15 of nagar panchayat obra
Construction work of rcc drain and coloured interlocking road from vinod gupta house to pwd road in ward 15 of nagar panchayat obra
Read moreof your Industry type