Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
724.5 Mtr I.E. 21 Pillars As Pillar Length Centre To Centre Is 34.5 Mtr. Shortening From 31 D/78 L To 10 D/78 L Of Lhcm 2 Section For Depillaring Of Panel 7/6 In R Vii Seam At 3n4 Incline, Jpc And Salvaging These Total Belt Materials With Electrical From
|
| Description |
724.5 Mtr I.E. 21 Pillars As Pillar Length Centre To Centre Is 34.5 Mtr. Shortening From 31 D/78 L To 10 D/78 L Of Lhcm 2 Section For Depillaring Of Panel 7/6 In R Vii Seam At 3n4 Incline, Jpc And Salvaging These Total Belt Materials With Electrical From
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_318705_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/76 dated 03.10.2024 |
| Tender Fee | 0 |
| EMD | 15100 |
| Tender Value | - |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330324 |
| Start Date | October 08, 2024 16:30 |
| End Date |
Expired
18/10/2024
Expired 689 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Installation of eleven reels 2200 mtr 1000mm belt of lhcm-2 belt conveyors running at 3n4 incline unit, j.p.colly.
Installation of eleven reels 2200 mtr 1000mm belt of lhcm-2 belt conveyors running at 3n4 incline unit, j.p.colly.
Read moreInstallation of three reels (600 mtr.) 1200mm belt in 2nd belt conveyor(main incline) and twelve reels (2400 mtr.) 1000mm belt of lhcm-2 belt conveyors running at 3n4 incline unit, j.p.colly.
Installation of three reels (600 mtr.) 1200mm belt in 2nd belt conveyor(main incline) and twelve reels (2400 mtr.) 1000mm belt of lhcm-2 belt conveyors running at 3n4 incline unit, j.p.colly.
Read morePillars shortening from -1d 80l to -6d 80l re fitting of 5 pillars structure from -6d 80l to 1d 80l of 1000mm 80l belt conveyor of lhcm-1 section in r-viia seam at 3n4 incline, jpc
Pillars shortening from -1d 80l to -6d 80l re fitting of 5 pillars structure from -6d 80l to 1d 80l of 1000mm 80l belt conveyor of lhcm-1 section in r-viia seam at 3n4 incline, jpc
Read moreTransportation, laying, lapping, fitting of various different length short piece (less than 200 mtr.) old, used belting in various lhcm-1 belt conveyors at r-viia seam at 3n4
Transportation, laying, lapping, fitting of various different length short piece (less than 200 mtr.) old, used belting in various lhcm-1 belt conveyors at r-viia seam at 3n4
 incline unit, jpc
Read moreInstallation of one no 90 mtr head complete turbine pump motor by transportation installation with necessary fabrication jobs at lhcm 1 in r viia seam at 3n4 incline unit jhanjra project colliery
Installation of one no 90 mtr head complete turbine pump motor by transportation installation with necessary fabrication jobs at lhcm 1 in r viia seam at 3n4 incline unit jhanjra project colliery
Read moreTransportation and changing of four reels i.e. 800 mtr. 1000mm type-6 pvc belting in 15xd tandem belt conveyor at r-viia seam along with salvaging of old 800 mtr. 1000mm belting from this belt conveyor to surface at 3n4 incline unit,j.p.colly.
Transportation and changing of four reels i.e. 800 mtr. 1000mm type-6 pvc belting in 15xd tandem belt conveyor at r-viia seam along with salvaging of old 800 mtr. 1000mm belting from this belt conveyor to surface at 3n4 incline unit,j.p.colly.
Read moreTransportation installation of 379.5 mtr. 1000mm belt structure with belting and eleven times transportation-installation of tail end unit along 74l for further development of panel-10 in r-viia seam by lhcm-1 at 3n4 incline, j.p.colly.
Transportation installation of 379.5 mtr. 1000mm belt structure with belting and eleven times transportation-installation of tail end unit along 74l for further development of panel-10 in r-viia seam by lhcm-1 at 3n4 incline, j.p.colly.
Read moreTransportation-installation of 310.5 mtr. 1000mm belt structure with belting and nine times transportation-installation of tail end unit along 5r for development of trunk road for panel-10, 11 n 12 in r-viia seam by lhcm-1 at 3n4 incline, j.p.colly.
Transportation-installation of 310.5 mtr. 1000mm belt structure with belting and nine times transportation-installation of tail end unit along 5r for development of trunk road for panel-10, 11 n 12 in r-viia seam by lhcm-1 at 3n4 incline, j.p.colly.
Read moreof your Industry type