Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Guntakal Division Den/North Jurisdiction Sw I Gy Wadi , Klu Gtl &Amp Bay Gtl Through Ballasting Of Track Along With Deep Screening With Bcm For A Total Distance Of 154.456km Sw Ii Gtl Wd &Amp Bay Gtl Sections Through Ballasting Of Turnouts Along With Deep Screening By Bcm For A Total Of 117 Sets And Sw Iii Gy Wadi Section Through Renewal Of Fittings (Tfr All Fittings) On Psc Sleeper Track For A Length Of 39.78km (Locations Enclosed As Annexure)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78845919 |
|
Reference Number |
Engg-GTL-North-1744 |
| Tender Fee | 0 |
| EMD | 6.28 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78845919/viewNitPdf_4796647.pdf |
| Start Date | December 13, 2024 18:24 |
| End Date |
Expired
03/01/2025
Expired 650 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Nanded division: mmr-mue (up&dn) sections :tbr- through ballasting of track along with deep screening by bcm for a total length of 56.216 km .
For complete deion and other details, please refer to tender
Read moreS&t requirements in connection with ttr (rails) work in ru-gtl, ndl-dhne, dhne-gtl, dmm-gy, gtl-wd & klu-gtl sections over guntakal division.
For complete deion and other details, please refer to tender
Read moreSecunderabad division: sw-i :bpq-kzj & magh-gdcr sections (dn,up&ud line ) : tbr (main line) : through ballasting of track along with deep screening by bcm for the total length of 83.134 kms (bpq-kzj-67.393 & magh-gdcr -15.741 tkm) at various locations .sw-ii :bpq-kzj section :tbr (loop lines): through ballasting of track along with deep screening by manual for the total length of 42.205 kms at various locations. sw-iii : bpq-kzj section :tbr (p& c) : through ballasting of tr
For complete deion and other details, please refer to tender
Read moreName of the work: secunderabad division: sc -wd & vkb-prli sections : sw-i: tbr: through ballasting of track along with deep screening by bcm for the total length of 13.65 kms (sc-wd-12.80tkm, & vkb-prli -0.85tkm) at various locations. sw-ii: tbr (loop lines): through ballasting of track along with deep screening by manual for the total length of 11.89 kms (sc-wd-5.89tkm & vkb-prli-6.00tkm) at various locations. sw-iii: tfr (all fittings): through renewal of fitting on psc s
For complete deion and other details, please refer to tender
Read more(1) sonpur division (dn/sl) : tfr = 36.217 km. (2) hajipur - chhapra gra:- tbr = 8.779 tkm. (ballasting of track including 300 mm deep screening with bcm.)
For complete deion and other details, please refer to tender
Read moreSw-i: through ballast renewal (main lines) by bcm for a total length of 12.705 tkm in aden/ndl section. sw-ii: through ballast renewal (loop lines) by manually for a total length of 9.842 tkm in aden/ndl section.
For complete deion and other details, please refer to tender
Read moreSw-i: through ballast renewal (main lines) by bcm for a total length of 44.197 tkm in aden/west/gnt section. sw-ii: through ballast renewal (loop lines) by manually for a total length of 4.057 tkm in aden/west/gnt section.
For complete deion and other details, please refer to tender
Read moreSw-i: through ballast renewal (main lines) by bcm for a total length of 44.197 tkm in aden/west/gnt section. sw-ii: through ballast renewal (loop lines) by manually for a total length of 4.057 tkm in aden/west/gnt section.
For complete deion and other details, please refer to tender
Read moreSw-i: through rail renewal (p) for a total length of 34.434 tkm in aden/nlda section. sw-ii: through ballast renewal (main line) by bcm for a total length of 16.536 tkm in aden/nlda section. sw-iii: through ballast renewal (loop lines) by manually for a total length of 8.355 tkm in aden/nlda section. sw-iv: through fittings renewal for a total length of 27.685 tkm in aden/nlda section. sw-v: through turnout renewal (fstwswcmsc) - 7nos in aden/nlda section. sw-vi: renewal of sejs with improve
For complete deion and other details, please refer to tender
Read moreGuntakal division: sw-i: ru-gtl(up&dn): ctr(p): complete track renewal(primary) of exg. 60kg/90uts rail on psc6 sleeper with new 60kg/r260 rail on new wider sleeper 1660 nos./km including recoupment of ballast and deep screening for a length of 1.74km. sw-ii: ru-gtl(up&dn), ndl-dhne-gtl(sl/up), gy-pdl(sl): trr(p) through rail renewal(primary) of exg. 60kg/52kg/90uts rail with new 60kg/r260 rail on psc6 sleeper for a length of 21.58km. sw-ii: ndl-dhne(sl): tsr(p) through sleeper renewal
For complete deion and other details, please refer to tender
Read moreof your Industry type