Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Comprehensive Tender For Railway Track Renewal Project 🛤️ The Ministry Of Railways, Central Government, Invites Tenders For A Comprehensive Railway Track Renewal Project In The Aden/Nlda Section. The Project Encompasses Various Components Including Through Rail Renewal, Through Ballast Renewal (Mainline And Loop Lines), Through Fittings Renewal, And Through Turnout Renewal. Additionally, There Is A Scope For The Renewal Of Switches And Crossings (Se Js) With Improvements. 📅 Bid Submission Deadline: June 07, 2024, 3:30 Pm A Tender Security Amounting To Inr 4,10,600/ Is Required At The Time Of Submission. Interested Bidders Should Meticulously Review The Tender Documents For Detailed Project Specifications, Requirements, And Submission Guidelines. Keywords: Railway Track Renewal, Railway Project, Ministry Of Railways, Tender, Aden/Nlda Section, Turnout Renewal, Se Js Renewal, Ballast Renewal, Rail Fittings Renewal, Tender Security, Bid Submission| Particulars | Details |
|---|---|
| Title |
Sw I: Through Rail Renewal (P) For A Total Length Of 34.434 Tkm In Aden/Nlda Section.
Sw Ii: Through Ballast Renewal (Main Line) By Bcm For A Total Length Of 16.536 Tkm In Aden/Nlda Section.
Sw Iii: Through Ballast Renewal (Loop Lines) By Manually For A Total Length Of 8.355 Tkm In Aden/Nlda Section.
Sw Iv: Through Fittings Renewal For A Total Length Of 27.685 Tkm In Aden/Nlda Section.
Sw V: Through Turnout Renewal (Fstwswcmsc) 7nos In Aden/Nlda Section.
Sw Vi: Renewal Of Se Js With Improve
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75109092 |
|
Reference Number |
436-DRM-W-GNT-Tid-2689 |
| Tender Fee | 0 |
| EMD | 4.11 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/062024/75109092/viewNitPdf_4569652.pdf |
| Start Date | May 15, 2024 23:39 |
| End Date |
Expired
07/06/2024
Expired 863 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Read more1. maksi - dewas - trr(p) - 11.709 tkm 2. indore-dewas-ujjain section- through rail renewal (p) total 4.354tkm & 3. indore - dewas - ujjain section - tfr - 36.973 tkm
1. maksi - dewas - trr(p) - 11.709 tkm 2. indore-dewas-ujjain section- through rail renewal (p) total 4.354tkm & 3. indore - dewas - ujjain section - tfr - 36.973 tkm
Read moreOpen e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,
Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,
Read moreB.t. renewal work on rau-mhow-mandleshwar road (total length-25 km.)
B.t. renewal work on rau-mhow-mandleshwar road (total length-25 km.)
Read moreMonitoring health of ballast bed with the help of ground penetration radar technology for through ballast renewal (tbr) and formation rehabilitation on indian railways
Monitoring health of ballast bed with the help of ground penetration radar technology for through ballast renewal (tbr) and formation rehabilitation on indian railways
Read moreB.t. renewal work at khandwa-dedtalai-burahanpur road in (total length 43 km.)
B.t. renewal work at khandwa-dedtalai-burahanpur road in (total length 43 km.)
Read moreThrough sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
Through sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
Read more(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.
(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.
Read moreSw-i-construction of new side drains by replacing damaged unserviceable drains- under aden/awb s jurisdiction(total qty=3200 rm) ).(irpsm id11.04.31.25.4.53.006)sw-ii-construction of new side drains by replacing damaged unserviceable drains- under aden/j s jurisdiction.(total qty=4800 rm).( irpsm id 11.04.31.25.4.53.003)sw-iii- construction of new side drains by replacing damaged unserviceable drains- under sse/pway /hnl under aden/pau s jurisdiction.( total qty=4800 rm).( irpsm
Sw-i-construction of new side drains by replacing damaged unserviceable drains- under aden/awb s jurisdiction(total qty=3200 rm) ).(irpsm id11.04.31.25.4.53.006)sw-ii-construction of new side drains by replacing damaged unserviceable drains- under aden/j s jurisdiction.(total qty=4800 rm).( irpsm id 11.04.31.25.4.53.003)sw-iii- construction of new side drains by replacing damaged unserviceable drains- under sse/pway /hnl under aden/pau s jurisdiction.( total qty=4800 rm).( irpsm
Read moreSw-i :- cess repairs/widening work, toe bank,sand or boulder drains under aden/pau s jurisdiction( total qty=65682 cum) .(irpsm id no.11.04.31.25.4.53.002)sw-ii :- cess repairs/widening work, toe bank,sand or boulder drains under aden/j s jurisdiction(total qty= 80852 cum(irpsm id no.11.04.31.25.4.53.008)
Sw-i :- cess repairs/widening work, toe bank,sand or boulder drains under aden/pau s jurisdiction( total qty=65682 cum) .(irpsm id no.11.04.31.25.4.53.002)sw-ii :- cess repairs/widening work, toe bank,sand or boulder drains under aden/j s jurisdiction(total qty= 80852 cum(irpsm id no.11.04.31.25.4.53.008)
Read moreof your Industry type