Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐ Tender Alert: Ballast Renewal Services For Indian Railways ๐ค๏ธ๐ The Ministry Of Railways, Central Government, Invites Bids From Eligible Contractors For The Renewal Of Ballast On Main And Loop Lines In The Aden/West/Gnt Section Under The Secunderabad Division. ๐ Bid Submission Deadline: June 07, 2024, 3:30 Pm The Scope Of Work Includes Complete Deion As Per Tender Documents. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 313,600. Detailed Tender Documents Are Available For Review To Provide Comprehensive Bids For The Following: Through Ballast Renewal (Main Lines): 44.197 Tkm ๐ค๏ธ Through Ballast Renewal (Loop Lines): 4.057 Tkm ๐ Keywords: Indian Railways, Ballast Renewal, Central Govt. Ministry/Department, Tender, Emd, Secunderabad, Aden/West/Gnt Section| Particulars | Details |
|---|---|
| Title |
Sw I: Through Ballast Renewal (Main Lines) By Bcm For A Total Length Of 44.197 Tkm In Aden/West/Gnt Section.
Sw Ii: Through Ballast Renewal (Loop Lines) By Manually For A Total Length Of 4.057 Tkm In Aden/West/Gnt Section.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75005359 |
|
Reference Number |
436-DRM-W-GNT-Tid-2686 |
| Tender Fee | 0 |
| EMD | 3.14 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/062024/75005359/viewNitPdf_4562988.pdf |
| Start Date | May 15, 2024 23:25 |
| End Date |
Expired
07/06/2024
Expired 863 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Read more1. maksi - dewas - trr(p) - 11.709 tkm 2. indore-dewas-ujjain section- through rail renewal (p) total 4.354tkm & 3. indore - dewas - ujjain section - tfr - 36.973 tkm
1. maksi - dewas - trr(p) - 11.709 tkm 2. indore-dewas-ujjain section- through rail renewal (p) total 4.354tkm & 3. indore - dewas - ujjain section - tfr - 36.973 tkm
Read moreOpen e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,
Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,
Read moreSw-i-construction of new side drains by replacing damaged unserviceable drains- under aden/awb s jurisdiction(total qty=3200 rm) ).(irpsm id11.04.31.25.4.53.006)sw-ii-construction of new side drains by replacing damaged unserviceable drains- under aden/j s jurisdiction.(total qty=4800 rm).( irpsm id 11.04.31.25.4.53.003)sw-iii- construction of new side drains by replacing damaged unserviceable drains- under sse/pway /hnl under aden/pau s jurisdiction.( total qty=4800 rm).( irpsm
Sw-i-construction of new side drains by replacing damaged unserviceable drains- under aden/awb s jurisdiction(total qty=3200 rm) ).(irpsm id11.04.31.25.4.53.006)sw-ii-construction of new side drains by replacing damaged unserviceable drains- under aden/j s jurisdiction.(total qty=4800 rm).( irpsm id 11.04.31.25.4.53.003)sw-iii- construction of new side drains by replacing damaged unserviceable drains- under sse/pway /hnl under aden/pau s jurisdiction.( total qty=4800 rm).( irpsm
Read moreSw-i :- cess repairs/widening work, toe bank,sand or boulder drains under aden/pau s jurisdiction( total qty=65682 cum) .(irpsm id no.11.04.31.25.4.53.002)sw-ii :- cess repairs/widening work, toe bank,sand or boulder drains under aden/j s jurisdiction(total qty= 80852 cum(irpsm id no.11.04.31.25.4.53.008)
Sw-i :- cess repairs/widening work, toe bank,sand or boulder drains under aden/pau s jurisdiction( total qty=65682 cum) .(irpsm id no.11.04.31.25.4.53.002)sw-ii :- cess repairs/widening work, toe bank,sand or boulder drains under aden/j s jurisdiction(total qty= 80852 cum(irpsm id no.11.04.31.25.4.53.008)
Read moreThrough sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
Through sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
Read more(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.
(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.
Read moreSc division- wd-sc section: sw-i::proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up & dn lines including station yard lines in sse/p.way/sem section under aden/tdu sub division.sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up & dn lines including station yard lines in sse/p.way/tdu section under aden/tdu sub division.
Sc division- wd-sc section: sw-i::proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up & dn lines including station yard lines in sse/p.way/sem section under aden/tdu sub division.sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up & dn lines including station yard lines in sse/p.way/tdu section under aden/tdu sub division.
Read moreManufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.
Manufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.
Read morePdpl-nzb section: sw-1: proposed safety related track maintenance works and miscellaneous track works (other than safety related track items) on single line including station yard lines in sse/p. way/krmr section & sw-ii: proposed safety related track maintenance works and miscellaneous track works (other than safety related track items) on single line including station yard lines in sse/p.way/armu section under aden/krmr sub-division.
Pdpl-nzb section: sw-1: proposed safety related track maintenance works and miscellaneous track works (other than safety related track items) on single line including station yard lines in sse/p. way/krmr section & sw-ii: proposed safety related track maintenance works and miscellaneous track works (other than safety related track items) on single line including station yard lines in sse/p.way/armu section under aden/krmr sub-division.
Read moreof your Industry type