Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏭 Procurement Opportunity: Turbine Pump And Pipeline Installation 🏭 Eastern Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids For The Installation Of A Turbine Pump With Motor And Electrical Room (Er) At 1186 M Sdl Section, Along With The Installation Of A 205 M 4 In Dia Ms Pipeline With Discharge At 0 D, R Vi. Additionally, The Project Includes Transporting The Pump From The Surface And Lifting A Roto Pump Set With Pump Motor And Baseframe. 📅 Bid Submission Deadline: May 07, 2024, 11:00 Am Emd: Inr 3000 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And A Timeline For Project Completion. This Project Is Located At Jhanjra Underground. Keywords: Turbine Pump, Pipeline Installation, Eastern Coalfields Limited, Public Sector Undertaking, Rfp, Bid Submission, Jhanjra UndergroundParticulars | Details |
---|---|
Title |
Installation Of One No Turbine Pump With Motor And Er At 1186 M Sdl Section And Installation Of One No 205 M 4 In Dia Ms Pipeline(discharge At 0 D,R Vi) After Transporting From Surface And Lifting Of One No Roto Pump Set(pump Motor With Baseframe) A
|
Description |
Installation Of One No Turbine Pump With Motor And Er At 1186 M Sdl Section And Installation Of One No 205 M 4 In Dia Ms Pipeline(discharge At 0 D,R Vi) After Transporting From Surface And Lifting Of One No Roto Pump Set(pump Motor With Baseframe) A
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_307105_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/07 dated 23.04.2024 |
Tender Fee | 0 |
EMD | 3000 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318236 |
Start Date | April 27, 2024 16:30 |
End Date |
07/05/2024 ( Expired 418 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Drilling of 175 mm dia 150 m deep tube well with installation of submersible motor pump includine electrification work with labor and material at site ward no. 28 kuber ashram file no. 142/25x9/1, 2nd call
Drilling of 175 mm dia 150 m deep tube well with installation of submersible motor pump includine electrification work with labor and material at site ward no. 28 kuber ashram file no. 142/25x9/1, 2nd call
Read moreInstallation of one no. 6 in dia ms pipe delivery line 600 mtr. from 23bdip 10l to 23bdip 1l, and then to 25d 1l through inclined, along with installation of two no s of goalposts for a newly installed pump of 23b dip in underground at mic, jpc
Installation of one no. 6 in dia ms pipe delivery line 600 mtr. from 23bdip 10l to 23bdip 1l, and then to 25d 1l through inclined, along with installation of two no s of goalposts for a newly installed pump of 23b dip in underground at mic, jpc
Read moreConstruction of 150mm and 200mm dia tube well with supply and installation of submersible motor pump including interconnection to pipeline at various places in jurisdiction of kota development authority (arc)
Construction of 150mm and 200mm dia tube well with supply and installation of submersible motor pump including interconnection to pipeline at various places in jurisdiction of kota development authority (arc)
Read moreDrilling of 175 mm dia and 150 mtr deep tubewell with installation of sumbersible motor pump including electrifcation network at site in gwalior vidhansabha ward 01 to 17 and 31,32,33 and 36 file no. 114/24x9/1.2nd call
Drilling of 175 mm dia and 150 mtr deep tubewell with installation of sumbersible motor pump including electrifcation network at site in gwalior vidhansabha ward 01 to 17 and 31,32,33 and 36 file no. 114/24x9/1.2nd call.
Read moreRewinding and repairing of submersible motor of different capacities and make with repairing of submersible pump bowl assembly at four (a-i) sub-division during 2025-26, redrilling and installation of one no ldtw(electrical) at kugachi under chakdaha
A. rewinding and repairing of submersible motor of different capacities (17.5-20 hp -6 nos) and make with repairing of submersible pump bowl assembly at kalyani (a-i) sub-division under kalyani (agri - irrign) division, kalyani, nadia during 2025-26.
Read moreInstallation of 01 no. pump-motor sets at kcc coal patch along with laying and jointing of pipeline at dipka expansion project.
Installation of 01 no. pump-motor sets at kcc coal patch along with laying and jointing of pipeline at dipka expansion project.
Read more(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
(a)shifting of 4000 gpm pump motor of sadbhavna sump (b)erection of 10inch dia ms pipeline (2nd range) from the sump to the top bench of 4th patch and other miscellaneous job related with pumping and pipeline works of socp and mocp patch, ampc.
Read moreSupply of energy efficient 5 star rating isi marked single phase submersible moter pump set of 100mm dia tube well with suitable ms clamp and control panel 160metar head discharge lpm 30 and suitable cable complete etc. file no. 153/25x9/1, 2nd call
Supply of energy efficient 5 star rating isi marked single phase submersible moter pump set of 100mm dia tube well with suitable ms clamp and control panel 160metar head discharge lpm 30 and suitable cable complete etc. file no. 153/25x9/1, 2nd call
Read moreAssistance require for lifting and lowering of 130-200 hp submersible pump and motor and surface pumps with allied works at 40 no. well and johilla pump house under nowrozabad sub area of johilla area. ( for 02 years )
Assistance require for lifting and lowering of 130-200 hp submersible pump and motor and surface pumps with allied works at 40 no. well and johilla pump house under nowrozabad sub area of johilla area. ( for 02 years )
Read moreInstallation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 75 days at bazari more under s.b. project.
Installation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 75 days at bazari more under s.b. project.
Read moreof your Industry type