Tender Details
Particulars | Details |
---|---|
Title |
Installation Of Two No 500 Gpm 240 M Head Turbine Pump At 10 L Between 0 D And 1 D After Transporting From Surface 3 D 18 L And Installation Of 2 Nos 252 M Long 6 In Pipeline And Make Necessary Fabrication From 0 D 10 L To 1 D 4 L Boreholes At Mic Jpc
|
Description |
Installation Of Two No 500 Gpm 240 M Head Turbine Pump At 10 L Between 0 D And 1 D After Transporting From Surface 3 D 18 L And Installation Of 2 Nos 252 M Long 6 In Pipeline And Make Necessary Fabrication From 0 D 10 L To 1 D 4 L Boreholes At Mic Jpc
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_310192_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/29 dated 04.06.2024 |
Tender Fee | 0 |
EMD | 9100 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321408 |
Start Date | June 14, 2024 16:30 |
End Date |
24/06/2024 ( Expired 301 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Installation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Read moreInstallation of one no new 1000gpm, 230m head turbine pump at 0d 9l with 250kw 6.6kv motor on baseframe and er after mounting of baseframe on a concrete platform 4mtrx2mtrx1ft fabrication and laying of 210 mtr 6 dia ms pipe from 0d 9l to 0d 4l b
Installation of one no new 1000gpm, 230m head turbine pump at 0d 9l with 250kw 6.6kv motor on baseframe and er after mounting of baseframe on a concrete platform 4mtrx2mtrx1ft fabrication and laying of 210 mtr 6 dia ms pipe from 0d 9l to 0d 4l b
Read moreLoading, transportation, unloading and installation of 500 gpm pump with electricals from surface to 3d/69le bagdona seam and loading, transportation, laying, tightening of 150mm ms pipe 300 meters from surface to 3d/69le bagdona seam at tawa mine
Loading, transportation, unloading and installation of 500 gpm pump with electricals from surface to 3d/69le bagdona seam and loading, transportation, laying, tightening of 150mm ms pipe 300 meters from surface to 3d/69le bagdona seam at tawa mine
Read moreFabrication and transportation of one 90m head 500 gpm pump with 90 kw motor, including all valves, bends, and associated electricals from surface, and installation at 23l/23d dip with required 820m 4-inch pipeline at r-vi seam at mic, jpc
Fabrication and transportation of one 90m head 500 gpm pump with 90 kw motor, including all valves, bends, and associated electricals from surface, and installation at 23l/23d dip with required 820m 4-inch pipeline at r-vi seam at mic, jpc
Read moreInstallation of two no 500 gpm 240m head turbine pump at 10l between 0d and 1d after transporting from surface 3d 18l and installation of 2 nos 252m long 6 in pipeline and make necessary fabrication from 0d 10l to 1d 4l boreholes at mic jpc
Installation of two no 500 gpm 240m head turbine pump at 10l between 0d and 1d after transporting from surface 3d 18l and installation of 2 nos 252m long 6 in pipeline and make necessary fabrication from 0d 10l to 1d 4l boreholes at mic jpc
Read moreTransportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor for a length of 420m from 3d/-4bl to 3d/-4nl cm panel- trunk road t5 in rv seam of mic, jpc.
Transportation, installation, commissioning, necessary fabrication and trial including civil work of one 1200 mm width 2x150kw, 6.6kv pvc belt conveyor for a length of 420m from 3d/-4bl to 3d/-4nl cm panel- trunk road t5 in rv seam of mic, jpc.
Read moreInstallation of one no turbine pump with motor and er at 1186m sdl section and installation of one no 205m 4in dia ms pipeline(discharge at 0d,r-vi) after transporting from surface and lifting of one no roto pump set(pump motor with baseframe) a
Installation of one no turbine pump with motor and er at 1186m sdl section and installation of one no 205m 4in dia ms pipeline(discharge at 0d,r-vi) after transporting from surface and lifting of one no roto pump set(pump motor with baseframe) a
Read moreInstallation of one no 900gpm, 90m head turbine pump at 5d between 19l and 20l after transporting from surface, installation of one no 500mtr long(approx) 6 in pipeline and make necessary fabrication for matching this line to pump and existing delive
Installation of one no 900gpm, 90m head turbine pump at 5d between 19l and 20l after transporting from surface, installation of one no 500mtr long(approx) 6 in pipeline and make necessary fabrication for matching this line to pump and existing delive
Read moreFabrication, transportation of one no. 90mtr head 500gpm pump with 90kw motor with all valves, bends and associate electricals from surface and installation of the same at 16l, 23c dip with required pipeline in r-vi seam at mic, jpc
Fabrication, transportation of one no. 90mtr head 500gpm pump with 90kw motor with all valves, bends and associate electricals from surface and installation of the same at 16l, 23c dip with required pipeline in r-vi seam at mic, jpc
Read moreTransportation and fitting of one nos. 90 mtr head pump with motor and all electricals and all valves and bends from 34d/-33l and installation of one nos new 3inch dia pipeline 480 mtr (approx) long each at mic, jpc.
Transportation and fitting of one nos. 90 mtr head pump with motor and all electricals and all valves and bends from 34d/-33l and installation of one nos new 3inch dia pipeline 480 mtr (approx) long each at mic, jpc.
Read moreof your Industry type