Tender Details

Particulars Details
Title
Construction Of 1 No. Retaining Wall At 20 L In Between 1 D And 2 D And 1 Nos. At 1 D In Between 4 L And 3 L, 2 Nos. At 13 L And 19 L Near 5 D At R Vi Seam Of Mic Under Jpc
Description
Construction Of 1 No. Retaining Wall At 20 L In Between 1 D And 2 D And 1 Nos. At 1 D In Between 4 L And 3 L, 2 Nos. At 13 L And 19 L Near 5 D At R Vi Seam Of Mic Under Jpc
Organisation Coal India Limited (CIL)
Tender Id 2023_ECL_289070_1
Reference
Number
GM/JNR/CIVIL/e-Tender/23-24/ 331 Date 13.09.2023
Tender Fee -
EMD 3900
Tender Value -
Place Online
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date September 20, 2023 16:30
End Date
Expired 30/09/2023

Expired 1109 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 4 no. retaining wall at 10l in between 4d and 5d, 4d in between 19l and 20l, 23d and 23a dip in between 9l and 10l in r-vi seam at mic under jpc

Construction of 4 no. retaining wall at 10l in between 4d and 5d, 4d in between 19l and 20l, 23d and 23a dip in between 9l and 10l in r-vi seam at mic under jpc

Read more
Repairing of ten (10) nos. sectionalisation stopping at 17l/3d-4d, 4d/17l-18l,18l/4d-5d, 5d/18l-19l,19l/5d-6d, 6d/19l-20l,20l/6d-7d, 7d/20l-21l,21l/7d-8d and 8d/21l-22l at old working in r-iii/ii seam of khottadih colliery pandaveswar area

Repairing of ten (10) nos. sectionalisation stopping at 17l/3d-4d, 4d/17l-18l,18l/4d-5d, 5d/18l-19l,19l/5d-6d, 6d/19l-20l,20l/6d-7d, 7d/20l-21l,21l/7d-8d and 8d/21l-22l at old working in r-iii/ii seam of khottadih colliery pandaveswar area

Read more
Construction of 02 nos. air crossings at -2d/3l and -2d/4l for circuit of cm panel trunk road t1 in r-v seam at mic under jpc

Construction of 02 nos. air crossings at -2d/3l and -2d/4l for circuit of cm panel trunk road t1 in r-v seam at mic under jpc

Read more
Construction of 04 nos. sectionalisation stoppings (for longwall panel-14 and panel-13) in 14l, 18l, 19l and in between 18l and 19l of r-vi seam at mic under jpc

Construction of 04 nos. sectionalisation stoppings (for longwall panel-14 and panel-13) in 14l, 18l, 19l and in between 18l and 19l of r-vi seam at mic under jpc

Read more
Installation of two no 500 gpm 240m head turbine pump at 10l between 0d and 1d after transporting from surface 3d 18l and installation of 2 nos 252m long 6 in pipeline and make necessary fabrication from 0d 10l to 1d 4l boreholes at mic jpc

Installation of two no 500 gpm 240m head turbine pump at 10l between 0d and 1d after transporting from surface 3d 18l and installation of 2 nos 252m long 6 in pipeline and make necessary fabrication from 0d 10l to 1d 4l boreholes at mic jpc

Read more
Construction of 02 nos retaining wall at 13x cut in between 5d and 6d in rvi seam at mic unit under jpc

Construction of 02 nos retaining wall at 13x cut in between 5d and 6d in rvi seam at mic unit under jpc

Read more
Construction of 01 nos retaining wall at 10l in between 0d and minus 1d in r vi seam of mic under jpc

Construction of 01 nos retaining wall at 10l in between 0d and minus 1d in r vi seam of mic under jpc

Read more
Construction of 04 nos ventilation stoppings near b shaft of r-viia seam and 2 no s ventilation stoppings in r-vii seam at 0l and 1l in between 1d and 2d at 3and4 incline under jpc

Construction of 04 nos ventilation stoppings near b shaft of r-viia seam and 2 no s ventilation stoppings in r-vii seam at 0l and 1l in between 1d and 2d at 3and4 incline under jpc

Read more
Installation of one no 900gpm, 90m head turbine pump at 5d between 19l and 20l after transporting from surface, installation of one no 500mtr long(approx) 6 in pipeline and make necessary fabrication for matching this line to pump and existing delive

Installation of one no 900gpm, 90m head turbine pump at 5d between 19l and 20l after transporting from surface, installation of one no 500mtr long(approx) 6 in pipeline and make necessary fabrication for matching this line to pump and existing delive

Read more
Construction of brick stair for cross over bridge at 5l 0d 20l 1d and 24l 5d haulage line at rj unit in banbahal rvii seam of bahula colliery under kenda area ecl

Construction of brick stair for cross over bridge at 5l 0d 20l 1d and 24l 5d haulage line at rj unit in banbahal rvii seam of bahula colliery under kenda area ecl

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise