Installation Of One No New 1000 Gpm, 230 M Head Turbine Pump At 0 D 9 L With 250k W 6.6k V Motor On Baseframe And Er After Mounting Of Baseframe On A Concrete Platform 4mtr X2mtr X1ft Fabrication And Laying Of 210 Mtr 6 Dia Ms Pipe From 0 D 9 L To 0 D 4 L B
|
Description |
Installation Of One No New 1000 Gpm, 230 M Head Turbine Pump At 0 D 9 L With 250k W 6.6k V Motor On Baseframe And Er After Mounting Of Baseframe On A Concrete Platform 4mtr X2mtr X1ft Fabrication And Laying Of 210 Mtr 6 Dia Ms Pipe From 0 D 9 L To 0 D 4 L B
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_325001_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/109 dated 02.01.2025 |
Tender Fee | 0 |
EMD | 3400 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336888 |
Start Date | January 10, 2025 16:30 |
End Date |
20/01/2025 ( Expired 91 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Installation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Read moreInstallation of one no new 1000gpm, 230m head turbine pump at 0d 9l with 250kw 6.6kv motor on baseframe and er after mounting of baseframe on a concrete platform 4mtrx2mtrx1ft fabrication and laying of 210 mtr 6 dia ms pipe from 0d 9l to 0d 4l b
Installation of one no new 1000gpm, 230m head turbine pump at 0d 9l with 250kw 6.6kv motor on baseframe and er after mounting of baseframe on a concrete platform 4mtrx2mtrx1ft fabrication and laying of 210 mtr 6 dia ms pipe from 0d 9l to 0d 4l b
Read moreTransportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Transportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Read moreTransportation installation with necessary fabrication jobs of one 90 mtr head complete turbine pump motor at 20xd 67l along with its 4 inch dia pipeline from 20xd 67l to 7xd sump in rvii seam at 3n4 incline unit jhanjra project colliery
Transportation installation with necessary fabrication jobs of one 90 mtr head complete turbine pump motor at 20xd 67l along with its 4 inch dia pipeline from 20xd 67l to 7xd sump in rvii seam at 3n4 incline unit jhanjra project colliery
Read moreDismantling, erection and fabrication of motor and gearbox base structure and its platform and fitting after modification and mounting of unit no. 68 crusher at secondary crusher and dismantling, erection and fabrication of head drum motor and gear
Dismantling, erection and fabrication of motor and gearbox base structure and its platform and fitting after modification and mounting of unit no. 68 crusher at secondary crusher and dismantling, erection and fabrication of head drum motor and gear
Read moreInstallation of two no 500 gpm 240m head turbine pump at 10l between 0d and 1d after transporting from surface 3d 18l and installation of 2 nos 252m long 6 in pipeline and make necessary fabrication from 0d 10l to 1d 4l boreholes at mic jpc
Installation of two no 500 gpm 240m head turbine pump at 10l between 0d and 1d after transporting from surface 3d 18l and installation of 2 nos 252m long 6 in pipeline and make necessary fabrication from 0d 10l to 1d 4l boreholes at mic jpc
Read moreTransportation laying fitting extension of 54 nos. or 324 mtr. 4in dia. spray pipeline with manifold after flange fitting welding on these pipes and transportation laying extension of 6.6kv grade cable, 3.3 kv grade cable with 550v cable acb and dril
Transportation laying fitting extension of 54 nos. or 324 mtr. 4in dia. spray pipeline with manifold after flange fitting welding on these pipes and transportation laying extension of 6.6kv grade cable, 3.3 kv grade cable with 550v cable acb and dril
Read moreInstallation of one no turbine pump with motor and er at 1186m sdl section and installation of one no 205m 4in dia ms pipeline(discharge at 0d,r-vi) after transporting from surface and lifting of one no roto pump set(pump motor with baseframe) a
Installation of one no turbine pump with motor and er at 1186m sdl section and installation of one no 205m 4in dia ms pipeline(discharge at 0d,r-vi) after transporting from surface and lifting of one no roto pump set(pump motor with baseframe) a
Read moreTransportation and installation of one no 240mtr head/500gpm pump with 190kw/6.6kv motor on base frame after making pcc foundation for base frame and mounting of base frame by grouting with roof bolts at 23bd/11l of r-vi seam at mic, jpc
Transportation and installation of one no 240mtr head/500gpm pump with 190kw/6.6kv motor on base frame after making pcc foundation for base frame and mounting of base frame by grouting with roof bolts at 23bd/11l of r-vi seam at mic, jpc
Read moreStrengthening of r-v pumping station by installing one no. turbine pump with motor (90m head, 90kw/550v) and er at -4dl/14d along with the existing pump and installation of one no. 650m 4 in dia ms pipe line (discharge point at -4fl/42r, r-vi se
Strengthening of r-v pumping station by installing one no. turbine pump with motor (90m head, 90kw/550v) and er at -4dl/14d along with the existing pump and installation of one no. 650m 4 in dia ms pipe line (discharge point at -4fl/42r, r-vi se