Tender Details
Particulars | Details |
---|---|
Title |
Installation Of One No Turbine Pump With Motor 90 M Head, 90k W 550 V, Base Frame And Er In Sector A In Cm 1 Panel At Rv Seam After Transportation Of Pipe From Surface And Installation One Pipeline For A Length Of 360 M Approx 60 Nos Pipe 4 In Dia
|
Description |
Installation Of One No Turbine Pump With Motor 90 M Head, 90k W 550 V, Base Frame And Er In Sector A In Cm 1 Panel At Rv Seam After Transportation Of Pipe From Surface And Installation One Pipeline For A Length Of 360 M Approx 60 Nos Pipe 4 In Dia
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_326399_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/121 dated 18.01.2025 |
Tender Fee | 0 |
EMD | 5700 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338306 |
Start Date | January 24, 2025 16:30 |
End Date |
03/02/2025 ( Expired 79 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation and installation of 01 no. 1000 gpm ht pump and 01 no. 500 gpm lt pump, with all accessory (motor, er, power cable and laying 6 inch dia. pipe line) in iv-b seam at piparia colliery (ug mine), umaria sub area, johilla area
Transportation and installation of 01 no. 1000 gpm ht pump and 01 no. 500 gpm lt pump, with all accessory (motor, er, power cable and laying 6 inch dia. pipe line) in iv-b seam at piparia colliery (ug mine), umaria sub area, johilla area
Read moreLoading, transportation, unloading installation of one 22kw 550v tugger haulage complete with electrical at 13d 83l and one time shifting in r-viia seam after necessary fabrication of base frame and fencing
Loading, transportation, unloading installation of one 22kw 550v tugger haulage complete with electrical at 13d 83l and one time shifting in r-viia seam after necessary fabrication of base frame and fencing
Read moreTransportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1 90kw, 550v, single drive belt conveyor along 85l from 4d to 12d in r-viia seam at 3n4 incline, j.p.colly
Transportation, installation, necessary fabrication, commissioning trial of one no. 1000 mm width, 1 90kw, 550v, single drive belt conveyor along 85l from 4d to 12d in r-viia seam at 3n4 incline, j.p.colly
Read moreInstallation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Installation of one no turbine pump with motor 90m head, 90kw 550v, base frame and er in sector -a in cm-1 panel at rv seam after transportation of pipe from surface and installation one pipeline for a length of 360m approx 60 nos pipe 4 in dia
Read moreTransportation installation of 01 nos. 3 in dia pipe line length 1392 mtrs. from 0dip r-vi seam up to 71dip in r-v seam for spray pipeline in cm-1 section in r-v seam of mic, j.p.colliery
Transportation installation of 01 nos. 3 in dia pipe line length 1392 mtrs. from 0dip r-vi seam up to 71dip in r-v seam for spray pipeline in cm-1 section in r-v seam of mic, j.p.colliery
Read moreInstallation of one no new 1000gpm, 230m head turbine pump at 0d 9l with 250kw 6.6kv motor on baseframe and er after mounting of baseframe on a concrete platform 4mtrx2mtrx1ft fabrication and laying of 210 mtr 6 dia ms pipe from 0d 9l to 0d 4l b
Installation of one no new 1000gpm, 230m head turbine pump at 0d 9l with 250kw 6.6kv motor on baseframe and er after mounting of baseframe on a concrete platform 4mtrx2mtrx1ft fabrication and laying of 210 mtr 6 dia ms pipe from 0d 9l to 0d 4l b
Read morePeriodical shifting of intermediate pump, ers, cables and extension of suction pipe in 96d cm panel, and 90lw panel and transportation of motor, er and ht pumps main dip in v- top seam at baherabandh u.g. mine of hasdeo area.
Periodical shifting of intermediate pump, ers, cables and extension of suction pipe in 96d cm panel, and 90lw panel and transportation of motor, er and ht pumps main dip in v- top seam at baherabandh u.g. mine of hasdeo area.
Read moreTransportation n installation of 02 nos. 4 in dia pipe line length 240mtrs. each from 0dip r-vi seam to 47dip in r-v seam for face pumping along with installation of two nos roto pump for face pumping in cm-1 section in r-v seam of mic, j.p.colliery
Transportation n installation of 02 nos. 4 in dia pipe line length 240mtrs. each from 0dip r-vi seam to 47dip in r-v seam for face pumping along with installation of two nos roto pump for face pumping in cm-1 section in r-v seam of mic, j.p.colliery
Read moreTransportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Transportation, installation with necessary fabrication of one no. 300 mtr. head turbine pump-motor-base frame including civil jobs, placing of er-cable n fitting of pipeline at 75l/-14d of r-viia seam at 3n4 incline unit, jhanjra project co
Read moreTransportation installation of 01 no. 3 in dia pipe line length 630mts. along with 90mts. head pump from 5d -4kl to 42d 4cl for pumping and extension of 636mts. of same pipline from 5d -4kl to 5d 7l for cm paneltrunk road t5 at rv seam of mic, j.p.
Transportation installation of 01 no. 3 in dia pipe line length 630mts. along with 90mts. head pump from 5d -4kl to 42d 4cl for pumping and extension of 636mts. of same pipline from 5d -4kl to 5d 7l for cm paneltrunk road t5 at rv seam of mic, j.p.
Read moreof your Industry type