Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Extension Of 4 R Belt Approx. 96 Meter And Shortening Of 4 R Belt Conveyor Of By 26 Pillars (832 Mtr.) For Depillaring Panel 3 By Cm 2 In Rv Seam Mic, Jhanjra Project Colliery.
|
| Description |
Extension Of 4 R Belt Approx. 96 Meter And Shortening Of 4 R Belt Conveyor Of By 26 Pillars (832 Mtr.) For Depillaring Panel 3 By Cm 2 In Rv Seam Mic, Jhanjra Project Colliery.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_294671_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/23-24/54 DATED 23.11.2023 |
| Tender Fee | - |
| EMD | 16900 |
| Tender Value | - |
| Place | Online |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 28, 2023 16:30 |
| End Date |
Expired
13/12/2023
Expired 999 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Extension of 6r belt approx. 96 meter and shortening of 6r belt conveyor by 26 pillars (832 mtr.) for depillaring panel-3 by cm-2 in rv seam of mic, jhanjra project colliery
Extension of 6r belt approx. 96 meter and shortening of 6r belt conveyor by 26 pillars (832 mtr.) for depillaring panel-3 by cm-2 in rv seam of mic, jhanjra project colliery
Read moreShortening of 9r belt conveyor for depillaring panel-27 by cm-1 at r-vi seam of mic, jpc
Shortening of 9r belt conveyor for depillaring panel-27 by cm-1 at r-vi seam of mic, jpc
Read moreInstallation of 4r substation by transportation of transformers, vcbs and cables to 4r/in between 4cl and 4bl for cm panel- trunk road t5 in rv seam of mic, jhanjra project colliery
Installation of 4r substation by transportation of transformers, vcbs and cables to 4r/in between 4cl and 4bl for cm panel- trunk road t5 in rv seam of mic, jhanjra project colliery
Read moreShortening of pony belt and gathering belt during retreating due to extraction of coal from depillaring panel no. 4j-5b of 4a seam at jhiria ug mine
Shortening of pony belt and gathering belt during retreating due to extraction of coal from depillaring panel no. 4j-5b of 4a seam at jhiria ug mine
Read moreShortening of discharge drum and structures of link belt conveyor for a length of approx.18 mtr. at mic, j.p.colly
Shortening of discharge drum and structures of link belt conveyor for a length of approx.18 mtr. at mic, j.p.colly
Read moreVulcanizing joint of 1200 mm wide steel cord belt type st 2500 by f.r. grade rubber and bonding materials at mic, jhanjra project colliery under jhanjra area
Vulcanizing joint of 1200 mm wide steel cord belt type st 2500 by f.r. grade rubber and bonding materials at mic, jhanjra project colliery under jhanjra area
Read morePillars shortening from -1d 80l to -6d 80l re fitting of 5 pillars structure from -6d 80l to 1d 80l of 1000mm 80l belt conveyor of lhcm-1 section in r-viia seam at 3n4 incline, jpc
Pillars shortening from -1d 80l to -6d 80l re fitting of 5 pillars structure from -6d 80l to 1d 80l of 1000mm 80l belt conveyor of lhcm-1 section in r-viia seam at 3n4 incline, jpc
Read moreExtenstion of 3d belt for a length of 315 mtr. from 3d 4nl to 3d 4l cm panel-trunk road t5 in rv seam of mic, jhanjra project colliery
Extenstion of 3d belt for a length of 315 mtr. from 3d 4nl to 3d 4l cm panel-trunk road t5 in rv seam of mic, jhanjra project colliery
Read more724.5 mtr i.e. 21 pillars as pillar length centre to centre is 34.5 mtr. shortening from 31d/78l to 10d/78l of lhcm-2 section for depillaring of panel-7/6 in r-vii seam at 3n4 incline, jpc and salvaging these total belt materials with electrical from
724.5 mtr i.e. 21 pillars as pillar length centre to centre is 34.5 mtr. shortening from 31d/78l to 10d/78l of lhcm-2 section for depillaring of panel-7/6 in r-vii seam at 3n4 incline, jpc and salvaging these total belt materials with electrical from
Read moreInstallation of 1000mm belt conveyor and their periodical extension and shortening of proposed depillaring panel 30ls in seam a and (-) 21rise (lhcm panel) in seam c at kurja ug mine for ten month time period.
Installation of 1000mm belt conveyor and their periodical extension and shortening of proposed depillaring panel 30ls in seam a and (-) 21rise (lhcm panel) in seam c at kurja ug mine for ten month time period.
Read moreof your Industry type