Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wb/Hzp/Kgp/Nit 22/2023 24
|
| Description |
Construction Of Guard Wall At Kumarchack Uttar Band Sasam
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_ZPHD_580293_1 |
|
Reference Number |
WB/HZP/KGP/NIT-22/2023-24 |
| Tender Fee | 500 |
| EMD | 2029 |
| Tender Value | |
| Place | KHARDAH GRAM PANCHAYAT |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | September 29, 2023 23:30 |
| End Date |
Expired
06/10/2023
Expired 1019 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreMaintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based
 maintenance contract in the state of uttar pradesh.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of drainage at mgr nagar in narasingarayanpettai
Construction of drainage at mgr nagar in narasingarayanpettai
Read moreDetailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreDevelopment of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works
Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreof your Industry type