Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Additional Room And Toilet To Infrastructure Strengthening Of Shc To Hwc At 2 Nos. Places In Peeplu Block (Sisola, Dodhwadi), Distt. Tonk. (Peeplu 1/2)
|
Description |
Construction Of Additional Room And Toilet To Infrastructure Strengthening Of Shc To Hwc At 2 Nos. Places In Peeplu Block (Sisola, Dodhwadi), Distt. Tonk. (Peeplu 1/2)
|
Organisation | Government of Rajasthan |
Tender Id | 2023_MEDIC_350561_2 |
Reference Number |
NIT 22/2023-24EEM and HDn. I Jaipur/ |
Tender Fee | 500 |
EMD | 23040 |
Tender Value | |
Place | Executive Engineer Medical Health Div I Japur |
Link | https://eproc.rajasthan.gov.in |
Start Date | July 14, 2023 23:00 |
End Date |
24/07/2023 ( Expired 696 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Read moreSupply, fabrication and erection of ss304l and carbon steel piping in block 1 and 2 of frp, frfcf
Supply, fabrication and erection of ss304l and carbon steel piping in block 1 and 2 of frp, frfcf
Read moreProvn of additional toilet block and allied works for living in billets at af stn vadodara
Provn of additional toilet block and allied works for living in billets at af stn vadodara
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreRaising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.
Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.
Read moreConstruction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreRectification of 01 nos. blackspots (bhutpura) on chittorgarh udaipur section and construction of new 2l elevated ramp at debari interchange on chittorgarh udaipur road section to provide connection from chittorgarh to pindwara
Rectification of 01 nos. blackspots (bhutpura) on chittorgarh udaipur section and construction of new 2l elevated ramp at debari interchange on chittorgarh udaipur road section to provide connection from chittorgarh to pindwara
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreof your Industry type