Tender Details
Particulars | Details |
---|---|
Title |
Construction Of H.R And C R Gate At Ch 0077 Km Yeliv Minor And C R Gate At Ch 4291 Km Medad Minor Ch 6487 Km Kachrewadi Minor Of On Dy No 58 Of N R B C And Other Related Work
|
Description |
Construction Of H.R And C R Gate At Ch 0077 Km Yeliv Minor And C R Gate At Ch 4291 Km Medad Minor Ch 6487 Km Kachrewadi Minor Of On Dy No 58 Of N R B C And Other Related Work
|
Organisation | CE-Water Resources Dept. Pune | State Govt. and UT |
Tender Id | 2025_CWRDP_1155943_1 |
Reference Number |
NOTICE NO. 17 FOR 2024.25 |
Tender Fee | 2860 |
EMD | 38300 |
Tender Value | |
Place | Malshiras |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2010876 |
Start Date | March 06, 2025 16:30 |
End Date |
20/03/2025 ( Expired 33 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreImprov and upgrad of nh734 sec of moradabad thakurdwara kashipur includ moradabad n kashipur bypass on epc basis in up n uttarakhand pkg iii kashipur bypass l14.490 km starts ch.38.770 and ends at ch.53.260 ch.05.560 of nh309
Improv and upgrad of nh734 sec of moradabad thakurdwara kashipur includ moradabad n kashipur bypass on epc basis in up n uttarakhand pkg iii kashipur bypass l14.490 km starts ch.38.770 and ends at ch.53.260 ch.05.560 of nh309
Read moreConstruction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConstruction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117
Construction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117
Read moreConstruction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Read moreCa no ge(n)amb-02/2025-26 special repair wk for roof treatment for block no. 183, 185, 186, 209, 211, 156, 157 and 159 of jcos/or md accn at abdul hamid lines of under age b/r-ii ge (north) ambala cantt
Ca no ge(n)amb-02/2025-26 special repair wk for roof treatment for 
 block no. 183, 185, 186, 209, 211, 156, 157 and 159 of jcos/or md accn 
 at abdul hamid lines of under age b/r-ii ge (north) ambala cantt
Read moreConstruction of interlocking tiles boundary wall maintenance new main gate and many more work (toiler work, ties, putty distemper etc) work at govt. m.s. ganga malanpur zone no. 23 ward no. 63 file no. 250/24x3/3
Construction of interlocking tiles boundary wall maintenance new main gate and many more work (toiler work, ties, putty distemper etc) work at govt. m.s. ganga malanpur zone no. 23 ward no. 63 file no. 250/24x3/3
Read moreof your Industry type