Tender Details

Particulars Details
Title
Construction Of H.R And C R Gate At Ch 0077 Km Yeliv Minor And C R Gate At Ch 4291 Km Medad Minor Ch 6487 Km Kachrewadi Minor Of On Dy No 58 Of N R B C And Other Related Work
Description
Construction Of H.R And C R Gate At Ch 0077 Km Yeliv Minor And C R Gate At Ch 4291 Km Medad Minor Ch 6487 Km Kachrewadi Minor Of On Dy No 58 Of N R B C And Other Related Work
Organisation CE-Water Resources Dept. Pune | State Govt. and UT
Tender Id 2025_CWRDP_1155943_1
Reference
Number
NOTICE NO. 17 FOR 2024.25
Tender Fee 2860
EMD 38300
Tender Value
Place Malshiras
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2010876
Start Date March 06, 2025 16:30
End Date

20/03/2025 ( Expired 33 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Read more
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Read more
Improv and upgrad of nh734 sec of moradabad thakurdwara kashipur includ moradabad n kashipur bypass on epc basis in up n uttarakhand pkg iii kashipur bypass l14.490 km starts ch.38.770 and ends at ch.53.260 ch.05.560 of nh309

Improv and upgrad of nh734 sec of moradabad thakurdwara kashipur includ moradabad n kashipur bypass on epc basis in up n uttarakhand pkg iii kashipur bypass l14.490 km starts ch.38.770 and ends at ch.53.260 ch.05.560 of nh309

Read more
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra

Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra

Read more
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)

Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)

Read more
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Read more
Construction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117

Construction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117

Read more
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police

Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police

Read more
Ca no ge(n)amb-02/2025-26 special repair wk for roof treatment for block no. 183, 185, 186, 209, 211, 156, 157 and 159 of jcos/or md accn at abdul hamid lines of under age b/r-ii ge (north) ambala cantt

Ca no ge(n)amb-02/2025-26 special repair wk for roof treatment for &#x0d block no. 183, 185, 186, 209, 211, 156, 157 and 159 of jcos/or md accn &#x0d at abdul hamid lines of under age b/r-ii ge (north) ambala cantt

Read more
Construction of interlocking tiles boundary wall maintenance new main gate and many more work (toiler work, ties, putty distemper etc) work at govt. m.s. ganga malanpur zone no. 23 ward no. 63 file no. 250/24x3/3

Construction of interlocking tiles boundary wall maintenance new main gate and many more work (toiler work, ties, putty distemper etc) work at govt. m.s. ganga malanpur zone no. 23 ward no. 63 file no. 250/24x3/3

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise