Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Hub Forging To Part No 985 Tm59221
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2024/B/4499477 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 18, 2024 15:08 |
| End Date |
Expired
29/01/2024
Expired 886 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | RAMKRISHNA FORGINGS LTD | Make : RKFL Model : HUB FORGING Title : 985TM59221 | 25-01-2024 19:37:59 | MII | Qualified |
| 2 | VINIR ENGINEERING PRIVATE LIMITED | Make : VINIR Model : VE 3551 Title : HUB | 29-01-2024 11:34:37 | MII | Qualified |
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | RAMKRISHNA FORGINGS LTD(MII) | Item Categories : PROCUREMENT OF HUB FORGING TO PART NO 985TM59221 | 834874.00 | L1 |
| 2 | VINIR ENGINEERING PRIVATE LIMITED (MII) | Item Categories : PROCUREMENT OF HUB FORGING TO PART NO 985TM59221 | 1486800.00 | L2 |
Ioh kit for valve model no. 3403-25-sb of rotex make as per rotex part no. 11zp25sb06003. make - rotex.
For complete deion and other details, please refer to tender
Read more1) condenser fan blade suitable for 1400 rpm motor, made from frp material with aluminum hub, overall unit dia 580 mm 2) condenser fan blade suitable for 1400 rpm motor, made from frp material with aluminum hub, overall unit dia 610 mm,
For complete deion and other details, please refer to tender
Read moreSingle core flexible elastomeric cable size 3 sq. mm, 750 volts grade as per rdso specification no. e-14/01 (part-i),rev.2,1993 with amendment no.4 of sept- 2003 or latest .
For complete deion and other details, please refer to tender
Read moreSpecial repair to cnc hub at tool room at 510 abw under age b/r-ii and age e/m-i of ge (north) meerut cantt
Special repair to cnc hub at tool room at 510 abw under age b/r-ii and age e/m-i of ge (north) meerut cantt
Read moreConstruction of skywalk with travelators at anand vihar multimodal hub for seamlessly connectivity between anand vihar railway station to isbt, kuashambi. for complete work details (please refer ifb).
Construction of skywalk with travelators at anand vihar multimodal hub for seamlessly connectivity between anand vihar railway station to isbt, kuashambi. for complete work details (please refer ifb).
Read moreCleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreConstruction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Read moreRepairing of rear wheel hub both sides, repairing of front right side suspension sup-port, replacement of left side hoist cylinder, and removing the anchor pin, worn out bush and repairing of anchor pin housing and fitment of anchor bushing and pin.
Repairing of rear wheel hub both sides, repairing of front right side suspension sup-port, replacement of left side hoist cylinder, and removing the anchor pin, worn out bush and repairing of anchor pin housing and fitment of anchor bushing and pin.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreProvision of false ceiling at bldg no p390 and addn altn to toilet at snco mess bldg no p1389 and improvement to electrical infra at bldg no p390 and provision of bitumen mastic flooring at lpg godown at ge af no 2 jodhpur
Provision of false ceiling at bldg no p390 and addn altn to toilet at snco mess bldg no p1389 and improvement to electrical infra at bldg no p390 and provision of bitumen mastic flooring at lpg godown at ge af no 2 jodhpur
Read moreof your Industry type