Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pbmc Work Of Rigid Pavement Of Nh 752 B Khilchipur Jirapur Section From Km 5.5 To Km 22.91, Length 17.410 Km In The State Of Madhya Pradesh
|
| Description |
Pbmc Work Of Rigid Pavement Of Nh 752 B Khilchipur Jirapur Section From Km 5.5 To Km 22.91, Length 17.410 Km In The State Of Madhya Pradesh
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_852066_1 |
|
Reference Number |
07/SAC/Tender/NH/BPL/2024-25 |
| Tender Fee | 11800 |
| EMD | 9.53 Lakh |
| Tender Value | - |
| Place | Khilchipur- Jirapur |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=915410 |
| Start Date | July 29, 2025 00:00 |
| End Date |
Expired
13/08/2025
Expired 431 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for dpr preparation for oti of jirapur-khilchipur and biaora-sironj sections of nh-752b and upgradation of 06 existing bridges/culverts on nh-347c in the state of madhya pradesh.
Consultancy services for dpr preparation for oti of jirapur-khilchipur and biaora-sironj sections of nh-752b and upgradation of 06 existing bridges/culverts on nh-347c in the state of madhya pradesh.
Read moreRepair/ rehabilitation/ restoration of existing rigid pavement on puintola tangi from km 284 to km 355 of nh 16 in the state of odisha
Repair/ rehabilitation/ restoration of existing rigid pavement on puintola tangi from km 284 to km 355 of nh 16 in the state of odisha
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreShort term maintenance with renewal coat on fexible pavement of nh 752-b khilchipur jirapur section from km 5.5 to km 22.91 (length 25.158 km) in the state of madhya pradesh
Short term maintenance with renewal coat on fexible pavement of nh 752-b khilchipur jirapur section from km 5.5 to km 22.91 (length 25.158 km) in the state of madhya pradesh
Read morePerformance based maintenance contract on rigid pavement of nh-752b maksudangarh - sironj section from km 42.510 to 92.640 (length 50.13 km) in the state of madhya pradesh
Performance based maintenance contract on rigid pavement of nh-752b maksudangarh - sironj section from km 42.510 to 92.640 (length 50.13 km) in the state of madhya pradesh
Read moreConsultancy services for authoritys engineer for supervision of upgradation to 2-lane with paved shoulder of jirapur-susner road, khilchipur bypass and biaora bypass total design length 57.29 km section of nh-752b in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of upgradation to 2-lane with paved shoulder of jirapur-susner road, khilchipur bypass and biaora bypass total design length 57.29 km section of nh-752b in the state of madhya pradesh
Read morePbmc work of rigid pavement of nh 752-b biaora maksudangarh section from km 3/150 to km 38/700, km 42/030 to km 42/510, length 36.03 km, in the state of madhya pradesh (2nd call)
Pbmc work of rigid pavement of nh 752-b biaora maksudangarh section from km 3/150 to km 38/700, km 42/030 to km 42/510, length 36.03 km, in the state of madhya pradesh (2nd call)
Read more(1) pbmc work of nh-98 (new nh-139) from km 57.049 to km 79.147 (total length 22.098 km) (2) pbmc work of nh-343 from km 109.70 to km 158.50 (total length 48.80 km) in the state of jharkhand.
(1) pbmc work of nh-98 (new nh-139) from km 57.049 to km 79.147 (total length 22.098 km) (2) pbmc work of nh-343 from km 109.70 to km 158.50 (total length 48.80 km) in the state of jharkhand.
Read more(2 ) pbmc work of nh-133 from km 94.00 to km 131.00 (total length 37.00 km) (2)pbmc work of nh-333a from km 0.00 to km 12.400 (total length 12.400 km) in the state of jharkhand.
(2 ) pbmc work of nh-133 from km 94.00 to km 131.00 (total length 37.00 km) (2)pbmc work of nh-333a from km 0.00 to km 12.400 (total length 12.400 km) in the state of jharkhand.
Read morePbmc work of nh-78 (new nh-43) from km 0.00 to km 10.00 (total length 10.00km) in the state of jharkhand
Pbmc work of nh-78 (new nh-43) from km 0.00 to km 10.00 (total length 10.00km) in the state of jharkhand
Read moreof your Industry type