Tender Details

About Tender

🛣️ Invitation For Bids: Nh966 4 Or 6 Laning Project 🛣️ The National Highways Authority Of India (Nhai) Is Seeking Bids From Reputable Contractors For The 4 Or 6 Laning Of The Edathanattukara To Karakkunnu Section Of Nh966, Spanning From Km 61.440 To Km 87.930 In The State Of Kerala, Under The Hybrid Annuity Mode. 📅 Bid Submission Deadline: July 01, 2024, 11:00 Am Tender Fee: Inr 1,00,000 Earnest Money Deposit (Emd): Inr 94,20,000 Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, In Accordance With The Project Specifications And Guidelines. This Project Is A Significant Step Towards Improving Connectivity And Infrastructure In The Region. Keywords: Nhai, Hybrid Annuity Mode, Highway Infrastructure, Nh966, Kerala, Highway Laning, Infrastructure Development, Government Tender, Bid Submission, Emd, Tender Fee
Particulars Details
Title
4 Or 6 Laning Of Edathanattukara To Karakkunnu Section Of Nh966 From Km. 61.440 To Km. 87.930 (Package 3) In The State Of Kerala On Hybrid Annuity Mode
Description
4 Or 6 Laning Of Edathanattukara To Karakkunnu Section Of Nh966 From Km. 61.440 To Km. 87.930 (Package 3) In The State Of Kerala On Hybrid Annuity Mode
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2022_NHAI_132146_1
Reference
Number
Tender Fee 1 Lakh
EMD 9.42 Crore
Tender Value
Place NHAI HQ
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=144499
Start Date October 14, 2022 23:30
End Date

20/03/2025 ( Expired 113 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Read more
Construction of 05 nos. of foot over bridge (fob) in bilaspur-pathrapali (km 0.000 to 53.300 km) section of nh-111 (new nh-130) in the state of chhattisgarh on epc mode

Construction of 05 nos. of foot over bridge (fob) in bilaspur-pathrapali (km 0.000 to 53.300 km) section of nh-111 (new nh-130) in the state of chhattisgarh on epc mode

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p

Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p

Read more
Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.

Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise