Tender Details
Particulars | Details |
---|---|
Title |
Estimate For Construction Of Sump Wall, Reparing Of Grooves And Extension Of Switch Room At Ph Jc 3 Of Jln Canal At Km 33.350
|
Description |
Estimate For Construction Of Sump Wall, Reparing Of Grooves And Extension Of Switch Room At Ph Jc 3 Of Jln Canal At Km 33.350
|
Organisation | Government of Haryana |
Tender Id | 2024_HRY_340842_1 |
Reference Number |
202327DC9E39 9A97 420E 9F54 53A43410AF4C137IRR |
Tender Fee | 1000 |
EMD | 34800 |
Tender Value | |
Place | W.S. Divn. No. II Rewari |
Link | https://etenders.hry.nic.in |
Start Date | January 01, 2024 23:30 |
End Date |
10/01/2024 ( Expired 491 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreSupply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at nathana, district bathinda, punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at nathana, district bathinda, punjab under amrut 2.0 scheme
Read moreConstruction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Read moreProviding tap connections to consumers, extension and augmentation of water supply system at banur district sas nagar, mohali for distribution network and installation of 3 nos. tube wells under amrut 2.0 scheme part1
Providing tap connections to consumers, extension and augmentation of water supply system at banur district sas nagar, mohali for distribution network and installation of 3 nos. tube wells under amrut 2.0 scheme part1
Read moreConstruction of single room and double room masonry buildings (brick structure) at various railway stations (moradabad division) for northern region of ailtel
Construction of single room and double room masonry buildings (brick structure) at various railway stations (moradabad division) for northern region of railtel
Read moreConstruction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, culvert, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at propose
Construction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, culvert, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at propose
Read moreConstruction of nbcc ph ii residential housing complex 3 towers of g plus 10 floors, lig and ews g plus 11 floors on epc basis with land measuring 10651.15 sqm 2.632 acres at bahadurpur, patna bihar on design, epc basis including o and m of 5 years
Construction of nbcc ph ii residential housing complex 3 towers of g plus 10 floors, lig and ews g plus 11 floors on epc basis with land measuring 10651.15 sqm 2.632 acres at bahadurpur, patna bihar on design, epc basis including o and m of 5 years
Read moreConstruction of building for kendriya vidyalaya no 04 09 staff quarters and boudary wall at kandhar lines delhi cantt deposit work
Construction of building for kendriya vidyalaya no 04 09 staff quarters and boudary wall at kandhar lines delhi cantt deposit work
Read moreof your Industry type