Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbiw/Se/Kc Ii/Nit 02e/2023 24
|
| Description |
Improvement Of Tarafeni South Main Canal North By Re Sectioning And Lining In Between Ch. 1041.00 And Ch. 1340.00 For A Total Length 7.74 Km At Slope And 2.32 Km. At Bed, At Block Jhargram, District Jhargram.
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_IWD_553549_2 |
|
Reference Number |
WBIW/SE/KC-II/NIT-02e/2023-24 |
| Tender Fee | |
| EMD | 10 Lakh |
| Tender Value | |
| Place | MIDNAPORE |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | August 10, 2023 15:30 |
| End Date |
Expired
07/09/2023
Expired 1012 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Wbiw/se/kc-ii/nit-04e/2023-24
Improvement of tarafeni south main canal north by re sectioning and lining in between ch. 1041.00 and ch. 1340.00 for a total length 7.74 km at slope and 2.32 km. at bed, at block jhargram, district jhargram.
Read moreGeneral-iip- main canal-rectification of damaged canal bed and side lining between ch.13480m to 13590m.-general civil work-1- cement concrete lined canal
Main canal-rectification of damaged canal bed and side lining
Read moreCement concrete lining work by paver machine in balance reaches between 78.50 km to 91.00 km (10.71 km length) in right main canal cad anta
Cement concrete lining work by paver machine in balance reaches between 78.50 km to 91.00 km (10.71 km length) in right main canal cad anta
Read moreCement concrete lining work by paver machine in balance reaches between 0.00 to 17.00 km (4.18 km length) in right main canal cad chambal kota
Cement concrete lining work by paver machine in balance reaches between 0.00 to 17.00 km (4.18 km length) in right main canal cad chambal kota
Read moreRemodeling of irrigation canal kurbathang between km 1st km and km 5th at different spots. under the project of improvement. re-modeling of kurbathang main irrigation canal
Remodeling of irrigation canal kurbathang between km 1st km and km 5th at different spots. under the project of improvement. re-modeling of kurbathang main irrigation canal
Read moreRe-sectioning of dy-7 of dwarka brahmani main canal from ch.141.00 to ch.292.00 and dy-1 of dwarka brahmani branch canal from ch.0.00 to ch.83.00 in the block-rampurhat-i in p.s- rampurhat in the district birbhum
Re-sectioning of dy-7 of dwarka brahmani main canal from ch.141.00 to ch.292.00 and dy-1 of dwarka brahmani branch canal from ch.0.00 to ch.83.00 in the block-rampurhat-i in p.s- rampurhat in the district birbhum
Read moreStone boulder lining work on slope of canal at u/s and d/s of constructed syphon at km. 49.500 (kharjhar nala) of rapti main canal in district-balrampur.
Stone boulder lining work on slope of canal at u/s and d/s of constructed syphon at km. 49.500 (kharjhar nala) of rapti main canal in district-balrampur.
Read moreRemodeling of irrigation canal kurbathang between km 5th and km 6th at different spots. under the project of improvement .re-modeling of kurbathang main irrigation canal
Remodeling of irrigation canal kurbathang between km 5th and km 6th at different spots. under the project of improvement .re-modeling of kurbathang main irrigation canal
Read moreStrenthaning of canal by renivation work of brick lining . in main canal between 0.000 km to 0.300 km at bhusi south pump canal including all cost of material, (excluding cement and brick ) labour and t and p used, complete in all respect as per dr
Strenthaning of canal by renivation work of brick lining . in main canal between 0.000 km to 0.300 km at bhusi south pump canal including all cost of material, (excluding cement and brick ) labour and t and p used, complete in all respect as per dr
Read moreStrenthaning of canal by 1st class brick lining work in main canal between 0.300 km to 0.600 km at bhusi south pump canal including all cost of material, (excluding cement and brick ) labour and t and p used, complete in all respect as per drawing
Strenthaning of canal by 1st class brick lining work in main canal between 0.300 km to 0.600 km at bhusi south pump canal including all cost of material, (excluding cement and brick ) labour and t and p used, complete in all respect as per drawing
Read moreof your Industry type