Tender Details
Particulars | Details |
---|---|
Title |
Cement Concrete Lining Work By Paver Machine In Balance Reaches Between 0.00 To 17.00 Km (4.18 Km Length) In Right Main Canal Cad Chambal Kota
|
Description |
Cement Concrete Lining Work By Paver Machine In Balance Reaches Between 0.00 To 17.00 Km (4.18 Km Length) In Right Main Canal Cad Chambal Kota
|
Organisation | CAD CHAMBAL, KOTA | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 17500 |
EMD | 99.87 Lakh |
Tender Value | |
Place | Tehsil Ladpura District Kota |
Link |
AAAAAAAAAA Login to view |
Start Date | April 09, 2025 16:30 |
End Date |
12/05/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConstruction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreConstruction of 1. awa to tedwa b.t. road length 2.30 km 2. otekasha to dongritola cement concrete road length- 0.85 km (pole shifting including electric work)
Construction of 1. awa to tedwa b.t. road length 2.30 km&#x0d 2. otekasha to dongritola cement concrete road length- 0.85 km (pole shifting including electric work)
Read moreShort term road maintenance work between km. 0.00 to 64.900 in nh 927k ranavav bhanvad khambhaliya road in the state of gujarat.
Short term road maintenance work between km. 0.00 to 64.900 in nh 927k ranavav bhanvad khambhaliya road in the state of gujarat.
Read moreProviding and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 0.00 to km 57.00 at different stretches on road jauljibi-munsiyari and tack coat with bitumen emulsion over existing surface, correction work with
Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 0.00 to km 57.00 at different stretches on road jauljibi-munsiyari and tack coat with bitumen emulsion over existing surface, correction work with
Read moreBalance work of flood mitigation works to meet recurring erosion due to joggal khad to protect massal sakra basti road in distt. kangra (h.p.).(sh-construction of wire crate work, cement concrete pavement and parapets etc)
Balance work of flood mitigation works to meet recurring erosion due to joggal khad to protect massal sakra basti road in distt. kangra (h.p.).(sh-construction of wire crate work, cement concrete pavement and parapets etc)
Read moreSc services for strengthening or overlay and operation and maintenance work on kota baran section of nh 27 from km 1080.263 to km 1184.322 (length 104.059 km) in the state of rajasthan
Sc services for strengthening or overlay and operation and maintenance work on kota baran section of nh 27 from km 1080.263 to km 1184.322 (length 104.059 km) in the state of rajasthan
Read moreCement concrete lining work by paver machine in balance reaches between 103.50 km to 124.00 km (8.76 km. length) of rmc cad anta
Cement concrete lining work by paver machine in balance reaches between 103.50 km to 124.00 km (8.76 km. length) of rmc cad anta
Read moreCement concrete lining work by paver machine in balance reaches between 0.00 to 17.00 km (4.18 km length) in right main canal cad chambal kota
Cement concrete lining work by paver machine in balance reaches between 0.00 to 17.00 km (4.18 km length) in right main canal cad chambal kota
Read moreof your Industry type