Tender Details

Particulars Details
Title
Acb Core Balance Transformer Part No Cbt80 M,Acb Shunt Trip Coils Part No 11 09 03,Acb Current Trans
Description
Organisation COAL INDIA LIMITED | Ministry of Coal
Tender Id GEM/2025/B/5951082
Reference
Number
Tender Fee
EMD
Tender Value
Place
Link https://bidplus.gem.gov.in/all-bids
Start Date February 14, 2025 22:51
End Date

01/03/2025 ( Expired 80 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information:
Buyer Details
Name: Rajesh Ramaswami
Address: Rajesh Ramaswami,[email protected],SECL MM KORBA AREA,KORBA,CHHATTISGARH,495677,India,7759-299613-
Ministry: Ministry Of Coal
Department: Coal India Limited
Organisation: South Eastern Coalfields Limited
Office Address: Secl Bilaspur Chhattisgarh
Similar Tenders
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor

Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor

Read more
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Balance work for construction of security barrack at 400 kv gis substation chandwa under jipp a1 project

Balance work for construction of security barrack at 400 kv gis substation chandwa under jipp a1 project

Read more
Construction of government polytechnic balance works at hardatt nagar girant, district shravasti up under the pmjvk

Construction of government polytechnic balance works at hardatt nagar girant, district shravasti up under the pmjvk

Read more
Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol

Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Balance works of sukhajani flow irrigation scheme ph-ii under aibp 2013-14 under mangaldoi dalgaon sipajhar division irrigation pkg_1

Balance works of sukhajani flow irrigation scheme ph-ii under aibp 2013-14 under mangaldoi dalgaon sipajhar division irrigation pkg_1

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise