Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Carriage Of Spillaged Coal From The Loading Section By Manual Labour Including Loading Unloading And Stacking To Belt/Chute/Suitable Place For A Lead Less Than 0.50 Km For A Period Of 06months At Rajrappa Washery
|
| Description |
Carriage Of Spillaged Coal From The Loading Section By Manual Labour Including Loading Unloading And Stacking To
Belt/Chute/Suitable Place For A Lead Less Than 0.50 Km For A Period Of 1 Year At Rajrappa Washery
Project.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_319318_1 |
|
Reference Number |
GM(R)/SO(W)/Rjp/24-25/Et/68dt 18.10.24 |
| Tender Fee | 0 |
| EMD | 17300 |
| Tender Value | |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330967 |
| Start Date | October 19, 2024 23:30 |
| End Date |
Expired
28/10/2024
Expired 611 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Carriage of spillaged coal from the raw coal section by manual labour including loading unloading and stacking to belt/chute/suitable place for lead less than 0.1 km for a period of 06 months at rajrappa washery
Carriage of
 spillaged coal from the raw coal section by manual labour including loading unloading and stacking to belt/chute/suitable place for lead less than 0.1 km for a period of 06
 months at rajrappa washery project.
Read moreCarriage of spillaged coal from the raw coal section by manual labor including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Carriage of spillaged coal from the raw coal section by manual labor including loading unloading 
 and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Read moreCleaning of spillage coal from different floors and equipment of ps5 main washing plant n ps4 building by the manual labor including loading unloading n stacking to belt/chutes/suitable place for lead less than 0.50 km at rajrappa washery
Cleaning of spillage
 coal from different floors and equipment of ps5 main washing plant n ps4 building by the manual labor including loading unloading n stacking to
 belt/chutes/suitable place for lead less than 0.50 km at rajrappa washery
Read moreCarriage of spillaged coal from apron feeder floor floor of primary crusher secondary crusher floor n surrounding area of raw coal site office of raw coal section by manual labour including loading unloading stacking to belt chutes suitable place
Carriage of spillaged coal from apron feeder floor floor of primary crusher secondary crusher floor n surrounding area of raw coal site office of raw coal section by manual labour including loading unloading stacking to belt chutes suitable place
Read moreCleaning of the drain at ps3 to ps4 under main washing plant (ps5) n its approach areas and surrounding area of workshop, light vehicles by manual labor including loading, unloading n stacking for a lead less than 0.5 km at rajrappa washery
Cleaning of the drain at ps3 to ps4 under main washing plant (ps5) n its approach areas and surrounding area of workshop, light vehicles by manual labor including loading, unloading n stacking for a lead less than 0.5 km at rajrappa washery
Read moreTransportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for lead upto 250 mtrs. in underground of no. 1 seam, bartunga hill mine.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for lead upto 250 mtrs. in underground of no. 1 seam, bartunga hill mine.
Read moreCarriage of material by manual labour loading unloading and stacking including tractor trolley for dinning hall restaurant building in golf club sec 3 panchkula
Carriage of material by manual labour loading unloading and stacking including tractor trolley for dinning hall restaurant building in golf club sec 3 panchkula
Read moreDismantling, overhauling and re-installation of gear box of crushers, apron feeders, belt conveyers under raw coal section of rajrappa washery project
Dismantling, overhauling and re-installation of gear box of crushers, apron feeders, belt conveyers under raw coal section of rajrappa washery project
Read moreRepairing/ strengthening of stringer channel, posts, bracing angle, deck plate and discharge chute for unit 801-a belt conveyor at moonidih coal washery.
Repairing/ strengthening of stringer channel, posts, bracing angle, deck plate and discharge chute for unit 801-a belt conveyor at moonidih coal washery.
Read moreRepairing of damaged reeling drum and changing bearing for carriage trolley for unit 403-b at rom section of moonidih coal washery.
Repairing of damaged reeling drum and changing bearing for carriage trolley for unit 403-b at rom section of moonidih coal washery.
Read moreof your Industry type