Tender Details
Particulars | Details |
---|---|
Title |
Carriage Of Spillaged Coal From The Raw Coal Section By Manual Labor Including Loading Unloading And Stacking To Belt/Chute/Suitable Place For A Lead Less Than 0.1 Km For A Period Of 03(three) Months At Rajrappa Washery Project
|
Description |
Carriage Of Spillaged Coal From The Raw Coal Section By Manual Labor Including Loading Unloading 
And Stacking To Belt/Chute/Suitable Place For A Lead Less Than 0.1 Km For A Period Of 03(three) Months At Rajrappa Washery Project
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 15400 |
Tender Value | |
Place | RAJRAPPA |
Link |
AAAAAAAAAA Login to view |
Start Date | April 22, 2025 23:30 |
End Date |
03/05/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Carriage of spillaged coal from the raw coal section by manual labor including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Carriage of spillaged coal from the raw coal section by manual labor including loading unloading 
 and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Read moreCleaning of the drain at ps3 to ps4 under main washing plant (ps5) n its approach areas and surrounding area of workshop, light vehicles by manual labor including loading, unloading n stacking for a lead less than 0.5 km at rajrappa washery
Cleaning of the drain at ps3 to ps4 under main washing plant (ps5) n its approach areas and surrounding area of workshop, light vehicles by manual labor including loading, unloading n stacking for a lead less than 0.5 km at rajrappa washery
Read moreCleaning of spillage coal from different floors and equipment of ps5 main washing plant n ps4 building by the manual labor including loading unloading n stacking to belt/chutes/suitable place for lead less than 0.50 km at rajrappa washery
Cleaning of spillage
 coal from different floors and equipment of ps5 main washing plant n ps4 building by the manual labor including loading unloading n stacking to
 belt/chutes/suitable place for lead less than 0.50 km at rajrappa washery
Read moreCarriage of spillaged coal from the loading section by manual labour including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.50 km for a period of 06months at rajrappa washery
Carriage of spillaged coal from the loading section by manual labour including loading unloading and stacking to
 belt/chute/suitable place for a lead less than 0.50 km for a period of 1 year at rajrappa washery
 project.
Read moreMaintenance of by pass chute , main feed chutes and associated platforms of conveyor belt wt-1 of raw coal section of bhojudih coal washery.
Maintenance of by pass chute , main feed chutes and associated platforms of conveyor belt wt-1 of raw coal section of bhojudih coal washery.
Read moreCarriage of spillaged coal from the raw coal section by manual labour including loading unloading and stacking to belt/chute/suitable place for lead less than 0.1 km for a period of 06 months at rajrappa washery
Carriage of
 spillaged coal from the raw coal section by manual labour including loading unloading and stacking to belt/chute/suitable place for lead less than 0.1 km for a period of 06
 months at rajrappa washery project.
Read moreTransportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for lead upto 250 mtrs. in underground of no. 1 seam, bartunga hill mine.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for lead upto 250 mtrs. in underground of no. 1 seam, bartunga hill mine.
Read moreNanded division: purna - akola section: supply and stacking of 50 mm gauge hard and durable machine crushed stone ballast at washim (whm) ballast depot and loading the same into hopper/traffic ballast wagon by mechanical means under aden/ak s jurisdiction for completion period 18 (eighteen months ) ( including (03)three months mobilization period).
For complete deion and other details, please refer to tender
Read moreDismantling, overhauling and re-installation of gear box of crushers, apron feeders, belt conveyers under raw coal section of rajrappa washery project
Dismantling, overhauling and re-installation of gear box of crushers, apron feeders, belt conveyers under raw coal section of rajrappa washery project
Read moreMaintenance of by pass chute , main feed chutes and associated platforms of conveyor belt wt-1 of raw coal section of bhojudih coal washery.
Maintenance of by pass chute , main feed chutes and associated platforms of conveyor belt wt-1 of raw coal section of bhojudih coal washery.
Read moreof your Industry type