Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Budget Work 2020 21 Providing Bm Patch And Bc Overlay Over Kwa Restored Bm Portion And Balance Portion Of Cherpu Thriprayar Road Ch.7.100 Kottam To 11.150 Peringottukara Water Tank Civil Work General Civil Work
|
| Description |
Dismantling Edge Concrete Bm Patch Bc Overlay
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWD_783672_1 |
|
Reference Number |
PWD/RB/TR/12079/2024_5_1_1/1 |
| Tender Fee | 6508 |
| EMD | 50000 |
| Tender Value | - |
| Place | Cherpu Thriprayar road |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1318880 |
| Start Date | September 12, 2025 23:30 |
| End Date |
Expired
22/09/2025
Expired 391 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General budget work 2020 21 20 percentage substitution work bm patch and bc overlay from ch 4 500 herbert canal 6 000 inchamudi of cherpu thriprayar road general civil work
General budget work 2020 21 20 percentage substitution work bm patch and bc overlay from ch 4 500 herbert canal 6 000 inchamudi of cherpu thriprayar road general civil work
Read moreGeneral deposit work urgent repair work 2025 26 urgent road repair work for improper restoration works carried out by kwa in cherpu thriprayar road from ch 7 100 to 9700 general civil work
General deposit work urgent repair work 2025 26 urgent road repair work for improper restoration works carried out by kwa in cherpu thriprayar road from ch 7 100 to 9700 general civil work
Read moreNon plan 2020-21 improvements to muvattupuzha anchalpetty road bm patch and bc overlay from ch. 0-000 to 4-000 - balance work
Clearing. ew, bm patch, bc overlay, drain work etc.
Read moreGeneral non plan road works 2020 21 providing bm patch and bc overlay to chalakudy anamala road ch 2 000 to 7 040 general civil work
Additional bm patches and bc overlay for entire width for 5040 m are proposed in this estimate. as traffic safety measures, provision for road marking with thermoplastic paint, fixing road studs for smooth drive in night hours, fixing reflective til
Read moreDeposit providing bm bc surfacing for pipe cutting area by kwa in thriprayar kanjany chavakkad road km 16/150 to 16/900 part ts for providing dbm for ch 16 184 to 16 900 general civil work
Deposit work
Read moreDeposit additional work pwd no lsn 7092 2024 chittar mankayam road work budget work 2024 25 20 upgradation with bm bc for 1.100 km overlay with 20mm cc for 7.000 km relaying kwa damaged pipe lines towards old bus stand pipeline work
Deposit additional work pwd no lsn 7092 2024 chittar mankayam road work budget work 2024 25 20 &#x0d upgradation with bm bc for 1.100 km overlay with 20mm cc for 7.000 km relaying kwa damaged pipe lines towards&#x0d old bus stand pipeline work
Read moreGeneral rp 2025 26 providing bc overlay bm patches and strengthening of damaged portion of sulthan bathery cherambadi road km 0 300 to3 000 ch btw km 0 300 to 3 000 general civil work 1
General rp 2025 26 providing bc overlay bm patches and strengthening of damaged portion of sulthan bathery cherambadi road km 0 300 to3 000 ch btw km 0 300 to 3 000 general civil work 1
Read moreGeneral combined deposit jjm restoration of pipe laying work by kwa kuruvilangad kuruppunthura road ch 3 500 to 4 500 rhs and ch 5 000 to 5 500 lhs and navakerala sadass 2024 25 providing bm patch bc overlay and allied works to thottuva kuruppunthur
General combined deposit jjm restoration of pipe laying work by kwa kuruvilangad kuruppunthura road ch 3 500 to 4 500 rhs and ch 5 000 to 5 500 lhs and navakerala sadass 2024 25 providing bm patch bc overlay and allied works to thottuva kuruppunthur
Read moreGeneral budget 2025 26 20 94 mile m.c road to punnakkal chungam roadproviding bm bc from 0 000 to 2 800 and providing 40mm mss between 2 800 and 3 620 including bc overlay to mooledam rob 40mm mss to service road and other allied works kwa road r
General budget 2025 26 20 94 mile m.c road to punnakkal chungam roadproviding bm bc from 0 000 to 2 800 and providing 40mm mss between 2 800 and 3 620 including bc overlay to mooledam rob 40mm mss to service road and other allied works kwa road r
Read moreBudget work 2020 21 providing bc overlay to oravakkal koorali road from ch8 500 to 13 533 except from ch9 140 to ch 9 950 deposit work 2023 24 restoration of trenching done by kwa at oravackal koorali road ch 8 000 to 9 140 km 9 950 to 13 550 km
Budget work 2020 21 providing bc overlay to oravakkal koorali road from ch8 500 to 13 533 except from ch9 140 to ch 9 950 deposit work 2023 24 restoration of trenching done by kwa at oravackal koorali road ch 8 000 to 9 140 km 9 950 to 13 550 km
Read moreof your Industry type