Tender Details
Particulars | Details |
---|---|
Title |
Renewal Lucknow Allahabad Road To Dalmau Jagatpur Road Km 1, 2, 3, 4(100), 5(750), 6, 7, 8(100)
|
Description |
Renewal Lucknow Allahabad Road To Dalmau Jagatpur Road Km 1, 2, 3, 4(100), 5(750), 6, 7, 8(100)
|
Organisation | Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT |
Tender Id | 2025_CEUCZ_995897_2 |
Reference Number |
101/8 Lekha/2024-25 Dt. 15-01-2025 |
Tender Fee | 860 |
EMD | 3 Lakh |
Tender Value | |
Place | RAEBARELI |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1765381 |
Start Date | January 23, 2025 14:30 |
End Date |
07/02/2025 ( Expired 108 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreOne time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read moreElectrical wiring at type 1 type 2,type 3 and type 4 at different departmental colonies at lucknow
Electrical wiring at type 1 type 2,type 3 and type 4 at different departmental colonies at lucknow
Read moreGreater bareilly awasiya yojna ke sec-3, 4, 5 avam 6 ke madhye 24.00 meter chaudi road par sewer line, water line rcc drain electrical trench divider avam sadak ka nirman karya
Greater bareilly awasiya yojna ke sec-3, 4, 5 avam 6 ke madhye 24.00 meter chaudi road par sewer line, water line rcc drain electrical trench divider avam sadak ka nirman karya
Read moreConstrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Read moreof your Industry type