Tender Details

About Tender

🛣️ Procurement Bid Invitation: Road Signage And Marking Works 🛣️ The Chief Engineer, Allahabad Zone, Pwd, Allahabad, Invites Bids From Experienced Contractors For The Execution Of Road Signage And Marking Works On The Fatehpur Dalmau Overhead Road (Odr) From Chainage 0 Point 00 To 12 Point 400. 📅 Bid Submission Deadline: July 12, 2024, 12:00 Pm Tender Fee: Inr 944 Emd: Inr 280,000 Interested Bidders Must Submit Detailed Proposals, Including Technical Capabilities, Work Methodology, And Financial Bids, In Accordance With The Project Specifications And Tender Documents. Keywords: Road Signage And Marking, Pwd, Allahabad Zone, Government Contract, Infrastructure Development, Tender, Bid, Fatehpur
Particulars Details
Title
Road Signage And Marking Works On Fatehpur Dalmau Odr Ch 0 Point 00 To 12 Point 400
Description
Road Signage And Marking Works On Fatehpur Dalmau Odr Ch 0 Point 00 To 12 Point 400
Organisation Cheif Engineer Allahabad Zone PWD Allahabad | State Govt. and UT
Tender Id 2024_CEALD_933409_1
Reference
Number
1192/A-5/E-Tendering/2024 Dated 07-06-2024
Tender Fee 944
EMD 2.8 Lakh
Tender Value
Place Fatehpur
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1613243
Start Date June 27, 2024 22:30
End Date

12/07/2024 ( Expired 349 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Work of one time treatment of bypassed portion of dharuhera town on nh 919, ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.

Work of one time treatment of bypassed portion of dharuhera town on nh 919,&#x0d ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.

Read more
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Read more
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra

Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise