Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Retaining Wall (Protection Wall) Near Minor Bridge At Km. 17/900, Construction Of Toe Wall And Protection Wall In Cement Concrete Near Minor Bridge At Km. 18/200 And 24/100. Construction Of Cross Drainage Work At Km 24/800 And 24/900
|
Description |
Construction Of Retaining Wall (Protection Wall) Near Minor Bridge At Km. 17/900, Construction Of Toe Wall And Protection Wall In Cement Concrete Near Minor Bridge At Km. 18/200 And 24/100. Construction Of Cross Drainage Work At Km 24/800 And 24/900
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1026537_1 |
Reference Number |
E Tender Notice No 252/13 2nd Call Of 2023-2024 |
Tender Fee | 1180 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Chh.Sambhajinagar |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1795013 |
Start Date | March 05, 2024 21:30 |
End Date |
11/03/2024 ( Expired 460 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreRenovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Renovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Read moreConstruction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)
Construction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)
Read moreof your Industry type