Tender Details

Particulars Details
Title
Construction Of Retaining Wall (Protection Wall) Near Minor Bridge At Km. 17/900, Construction Of Toe Wall And Protection Wall In Cement Concrete Near Minor Bridge At Km. 18/200 And 24/100. Construction Of Cross Drainage Work At Km 24/800 And 24/900
Description
Construction Of Retaining Wall (Protection Wall) Near Minor Bridge At Km. 17/900, Construction Of Toe Wall And Protection Wall In Cement Concrete Near Minor Bridge At Km. 18/200 And 24/100. Construction Of Cross Drainage Work At Km 24/800 And 24/900
Organisation Public Works Region | State Govt. and UT
Tender Id 2024_PWR_1026537_1
Reference
Number
E Tender Notice No 252/13 2nd Call Of 2023-2024
Tender Fee 1180
EMD 1.5 Lakh
Tender Value
Place Chh.Sambhajinagar
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1795013
Start Date March 05, 2024 21:30
End Date

11/03/2024 ( Expired 457 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.

Construction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.

Read more
Construction of rrm protection wall at new tower no.: 04

Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge

Read more
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

Read more
Toe protection and landslide stabilization work along left bank of river alaknanda at jyotirmath in district-chamoli (uttarakhand).

Toe protection and landslide stabilization work along left bank of river alaknanda at jyotirmath in district-chamoli (uttarakhand).

Read more
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Click Here to Download Dockets