Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Bordi Biranpur Road Length 1.00 K.M.
|
| Description |
Construction Of Bordi Biranpur Road Length 1.00 K.M.
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_320724_1 |
|
Reference Number |
44-3/SAC/2023-24 BALAGHAT DATE 19/12/2023 |
| Tender Fee | 10000 |
| EMD | 67660 |
| Tender Value | |
| Place | CHIEF ENGINEER (C.Z.) P.W.D. JABALPUR |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | December 21, 2023 23:00 |
| End Date |
Expired
10/01/2024
Expired 893 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Urgent repair works 1.00 kmp to 1.500 kmp in patches tengua-basulichak road under haldia construction sub-division no-i in the district of purba medinipur in the year 2026-2027. sl-03
Urgent repair works 1.00 kmp to 1.500 kmp in patches tengua-basulichak road under haldia construction sub-division no-i in the district of purba medinipur in the year 2026-2027.
Read moreHeavy duty round endless polyster sling of effective length 3 meters (circumfertial length of 6 meters) of 04ton capacity with testing certifiate.
For complete deion and other details, please refer to tender
Read moreConstruction of interlocking road and drain from manokamna temple gate to the pond in mohammed ramlila ward no. 7 of nagar panchayat jhalhu, bijnor district. length 80.30 meters.
Construction of interlocking road and drain from manokamna temple gate to the pond in mohammed ramlila ward no. 7 of nagar panchayat jhalhu, bijnor district. length 80.30 meters.&#x0d
Read moreConstruction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of nala and cc road on morra road
Construction of nala and cc road on morra road
Read moreConstruction of road behind...
Construction of road behind court along nala from court road to shekhpura, mc narnaul
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreProvn of view cutter of size 90 mtr length and 8 ft height at panchjanya auditorium under ge dronachal
Provn of view cutter of size 90 mtr length and 
 8 ft height at panchjanya auditorium under ge 
 dronachal
Read moreConstruction of odc road from new b and p chambers to main road
Construction of odc road from new b and p chambers to main road
Read moreof your Industry type