Tender Details
Particulars | Details |
---|---|
Title |
R/M Of Design Division No 02 And 04 Of Official Buildings Under Irrigation Division Deoghar
|
Description |
R/M Of Design Division &Amp#X0d
No 02 And 04 Of Official Buildings Under Irrigation Division Deoghar
|
Organisation | WRD EinC Major-Med n Minor | State Govt. and UT |
Tender Id | 2024_WRD_81543_1 |
Reference Number |
WRD/I.D.Deoghar/F2-02/23-24 |
Tender Fee | 10000 |
EMD | 1.77 Lakh |
Tender Value | |
Place | DEOGHAR |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=109117 |
Start Date | January 25, 2024 00:00 |
End Date |
07/02/2024 ( Expired 462 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreAAAAAAAAAA
Login to viewSupply, delivery and installation overhead pole at para water supply scheme (intake site) and other allied works under pmd, phe dte.
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreDesign, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreSpl repair to existing centre toilet et-20, et-21 and et-22 alongwith replacement / repair and cleaning of sewage, soakage pits and septic tanks (both e/m, b/r works) of depot regt (corps of signals) under ge (east) jabalpur
Spl repair to existing centre toilet et-20, et-21 and et-22 alongwith replacement / repair and cleaning of sewage, soakage pits and septic tanks (both e/m, b/r works) of depot regt (corps of signals) under ge (east) jabalpur
Read moreWbphed/02/bwn of se/cc of 2025-2026 sl.no.3
Balance work such as lds fhtc sinking of tube well road restoration hdd work and other ancially work for 11 eleven nos. pwss under bhatar block of durgapur sub division under burdwan division phe dte.&#x0d &#x0d &#x0d &#x0d &#x0d &#x0d
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreRepairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Read moreConstruction of technical buildings and allied infrastructure under ge (p) nagrota
Construction of technical buildings and allied infrastructure under ge (p) nagrota
Read moreof your Industry type