Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbpwd/Ee/Hcd/ Ni Te 38, Sl 1 Of 2025 2026
|
| Description |
Patch Repair Work Of Kotulpur Arambagh Road From Ch. 36.00 Kmp To Ch. 42.00 Kmp, Ch. 44.50 Kmp To Ch. 45.50 Kmp (Excluding Rigid Pavement Ch. 37.103 Kmp To 37.70 Kmp, Ch. 40.020 Kmp To 40.222 Kmp, Ch. 40.615 Kmp To 42.00 Kmp, Ch. 45.392 Kmp To 45.50k
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2026_PWD_982794_7 |
|
Reference Number |
WBPWD/EE/HCD/ NITe-38 of 2025-2026 |
| Tender Fee | 0 |
| EMD | 55501 |
| Tender Value | |
| Place | Hooghly |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2397619 |
| Start Date | January 05, 2026 16:30 |
| End Date |
Expired
26/01/2026
Expired 156 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Repair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Read moreCertain repair to misc b/r work in otm/ md accn in aor of age b/r-ii ,east of jhoke road under ge (east) ferozepur cantt
Certain repair to misc b/r work in otm/ md accn in aor of age b/r-ii ,east of jhoke road under ge (east) ferozepur cantt
Read moreProvn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Provn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreWbpwd/ee/hcd/ nite-26 of 2024-2025
Patch repairing work at kotulpur arambagh road from ch. 42.00 kmp to ch.54.00 kmp (excluding 2 nos rigid pavement stretches) in different stretches under hooghly construction sub-division-i, arambagh under hooghly construction division, p.w.d. duri
Read moreWbpwd/ee/hcd/nite-18 of 2025-26
Burdwan-arambagh road -ch. from 31.20 kmp to 41.46- strengthening work --- patch repairing work of burdwan arambagh road from ch. 32.20 kmp to 33.10 kmp, ch34.10 kmp to 34.80 kmp , ch. 35.30kmp to 36.00 kmp,ch37.10 kmp to 37.30 kmp, ch 38.00 kmp t
Read moreBblr road 42.00 kmp to 46.00 kmp emergent patch repair
Bblr road 42.00 kmp to 46.00 kmp emergent patch repair
Read moreWbpwd/ee/hcd/ nit e-03 sl-1 of 2024-2025
Patch repair and maintenance works and allied works on linking roads of kotulpur arambagh road chainage 36.00 kmp to 54.00 kmp in respect of road safety ground under hooghly construction sub-division-i, pwd, arambagh under hooghly construction divi
Read moreWbpwd/ee/hcd/ nite-13, sl-1 of 2025-2026
Rain damaged patch repairing work of kotulpur arambagh road from ch.50.6 kmp to ch. 51.8 kmp in different stretches under hooghly construction sub-division-i, pwd arambagh under hooghly construction division, p.w.d. during the year 2025-2026.
Read moreof your Industry type