Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Construction Of Boundary Wall Including Land Development, Internal Road And Drainage System Of 10 Bedded Phc At Samsing, Jalpaigur.
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 3.24 Lakh |
Tender Value | |
Place | Mal |
Link |
AAAAAAAAAA Login to view |
Start Date | May 07, 2025 21:30 |
End Date |
29/05/2025 ( 24 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Epc package for development of battery energy storage system (bess)at ntpc ramagundam (100 mw / 400 mwh) and sipat (30 mw / 120 mwh).
Epc package for development of battery energy storage system (bess)at ntpc ramagundam (100 mw / 400 mwh) and sipat (30 mw / 120 mwh).
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreConstruction of fast track buildings at iit bombay
Construction of fast track buildings including design ,drawing, finishing works, water supply and sanitary installations, internal and external electrical installation , lan, wifi,cctv, fire-fighting system, automatic fire alarm etc. at iit bombay
Read moreDesign and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of wbm road over dyke top and ramp of the ash pond at sgtpp, wbpdcl.
Construction of wbm road over dyke top and ramp of the ash pond at sgtpp, wbpdcl.
Read moreConstruction of approaches and protection wall across bandiya river in km. 3.035 on msh.09 to kamlapur damrancha mannerajaram tadgaon kandoli road odr.26 ta. bhamragad dist. gadchiroli
Construction of approaches and protection wall across bandiya river in km. 3.035 on msh.09 to kamlapur damrancha mannerajaram tadgaon kandoli road odr.26 ta. bhamragad dist. gadchiroli
Read moreof your Industry type