Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
4 Lane Divided Carriageway Of Orai Bhognipur Section (Km 220.00 To 255.00) On Nh 25 And Bhognipur Barah Section (Km 421.20 To Km 449.00) On Nh 2 On Bot (Annuity) Basis In The State Of Up
|
| Description |
4 Lane Divided Carriageway Of Orai Bhognipur Section (Km 220.00 To 255.00) On Nh 25 And Bhognipur Barah Section (Km 421.20 To Km 449.00) On Nh 2 On Bot (Annuity) Basis In The State Of Up
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_213930_1 |
|
Reference Number |
NHAI/PIU-Jhansi/RO-UP West/2024 |
| Tender Fee | 50000 |
| EMD | 1.34 Crore |
| Tender Value | - |
| Place | LUCKNOW |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=243281 |
| Start Date | December 12, 2024 14:30 |
| End Date |
Expired
08/01/2025
Expired 645 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of orai barah section of nh27 from ex. km 1515.713 to km 1578.383 in the state of uttar pradesh on ham (total length 62.670 km).
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of orai barah section of nh27 from ex. km 1515.713 to km 1578.383 in the state of uttar pradesh on ham (total length 62.670 km).
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Read moreUpgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreEr of bc overlay and potholes patches raveling on mcw risk and cost of concessionaire of 4-lane of orai -bhognipur section (km 220 to 255) on nh-25 and bhognipur barah section (km 421 to km 449) on nh-2 on bot (annuity) basis
Er of bc overlay and potholes patches raveling on mcw risk and cost of concessionaire of 4-lane of orai -bhognipur section (km 220 to 255) on nh-25 and bhognipur barah section (km 421 to km 449) on nh-2 on bot (annuity) basis
Read moreProviding and fixing of metal beam crash barrier from navipur areas on orai bhognipur barah section on nh 27
Providing and fixing of metal beam crash barrier from navipur areas on orai bhognipur barah section on nh 27
Read moreStrengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-2nd call
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-2nd call
Read moreof your Industry type