| Particulars | Details |
|---|---|
| Title |
Er Of Bc Overlay And Potholes Patches Raveling On Mcw Risk And Cost Of Concessionaire Of 4 Lane Of Orai Bhognipur Section (Km 220 To 255) On Nh 25 And Bhognipur Barah Section (Km 421 To Km 449) On Nh 2 On Bot (Annuity) Basis
|
| Description |
Er Of Bc Overlay And Potholes Patches Raveling On Mcw Risk And Cost Of Concessionaire Of 4 Lane Of Orai Bhognipur Section (Km 220 To 255) On Nh 25 And Bhognipur Barah Section (Km 421 To Km 449) On Nh 2 On Bot (Annuity) Basis
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_221282_1 |
|
Reference Number |
NHAI/RO-UP(W)/Orai-Barah/NH-27 |
| Tender Fee | 50000 |
| EMD | 17.63 Lakh |
| Tender Value | |
| Place | LUCKNOW |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=246150 |
| Start Date | December 25, 2024 14:30 |
| End Date |
Expired
13/01/2025
Expired 522 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreCapacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor
Capacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor
Read more4-lane divided carriageway of orai -bhognipur section (km 220.00 to 255.00) on nh-25 and bhognipur barah section (km 421.20 to km 449.00) on nh-2 on bot (annuity) basis in the state of up
4-lane divided carriageway of orai -bhognipur section (km 220.00 to 255.00) on nh-25 and bhognipur barah section (km 421.20 to km 449.00) on nh-2 on bot (annuity) basis in the state of up
Read moreStrengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-2nd call
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-2nd call
Read moreStrengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Read moreProviding and fixing of metal beam crash barrier from navipur areas on orai bhognipur barah section on nh 27
Providing and fixing of metal beam crash barrier from navipur areas on orai bhognipur barah section on nh 27
Read moreProviding and fixing of w metal beam crash barrier at navipur areas on orai bhognipur barah section on nh27
Providing and fixing of w metal beam crash barrier at navipur areas on orai bhognipur barah section on nh27
Read moreStrengthening and overlay on damaged sections of six lane ahmedabad to vadodara section of nh 48 (old nh-8) from km. 6.400 to km. 108.700 (length 102.300 km) in the state of gujarat at risk and cost of concessionaire on single percentage item rate ba
Strengthening and overlay on damaged sections of six lane ahmedabad to vadodara section of nh 48 (old nh-8) from km. 6.400 to km. 108.700 (length 102.300 km) in the state of gujarat at risk and cost of concessionaire on single percentage item rate ba
Read moreEmergent repair work from indore to dhar section on risk and cost of the concessionaire for 4 lane of indore gujarat mp border on bot toll basis from km 9.500 to km 118.200 of nh-59 on dbfot in the state of mp under nhdp phase
Emergent repair work from indore to dhar section on risk and cost of the concessionaire for 4 lane of indore gujarat mp border on bot toll basis from km 9.500 to km 118.200 of nh-59 on dbfot in the state of mp under nhdp phase
Read moreIndependent engineer services for oandm period for the work of 4 lane muzaffarpur-darbhanga -purnea section of nh 57 (km. 0.00 to km. 148.550 and 159.357 to km. 287.860) (bot annuity section) of nh -57 on omt basis in the state of bihar.
Independent engineer services for oandm period for the work of 4 lane muzaffarpur-darbhanga -purnea section of nh 57 (km. 0.00 to km. 148.550 and 159.357 to km. 287.860) (bot annuity section) of nh -57 on omt basis in the state of bihar.
Read moreof your Industry type