Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pbmc Work Of Nh 320 G From Km 42.25 To Km 100.85 (Total Length 58.60 Km) In The State Of Jharkhand
|
| Description |
Pbmc Work Of Nh 320 G From Km 42.25 To Km 100.85 (Total Length 58.60 Km) In The State Of Jharkhand
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2023_MoRTH_785552_1 |
|
Reference Number |
|
| Tender Fee | 11800 |
| EMD | 46.9 Lakh |
| Tender Value | |
| Place | Nawamundi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=825763 |
| Start Date | December 18, 2023 17:30 |
| End Date |
Expired
18/01/2024
Expired 888 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreWork on nh-415 from km 29.500 to km 51.740
Stmc work on nh-415 from km 29.500 to km 51.740
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreRestoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Read moreShort term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.
Short term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.
Read moreSupervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb
Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreFour laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type