Tender Details
Particulars | Details |
---|---|
Title |
Shifting Of 05 Nos. Of Transformer Tsu315 Kva, 3.3 Kv / 570 V With All Electrical Equipments From Vii Seam To Vi Top Seam For Proposed Depillaring Cm Panel C1 And C2 At Bangwar Ug Mine Of Sohagpur Area .
|
Description |
Shifting Of 05 Nos. Of Transformer Tsu315 Kva, 3.3 Kv / 570 V With All Electrical Equipments From Vii Seam To Vi Top Seam For Proposed Depillaring Cm Panel C1 And C2 At Bangwar Ug Mine Of Sohagpur Area .
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_325821_1 |
Reference Number |
SECL/SGP/SO(M)/e-T/35/24-2 5/674 Dt015.01.2025 |
Tender Fee | 0 |
EMD | 7100 |
Tender Value | |
Place | Bangwar UG MIne |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337740 |
Start Date | January 23, 2025 14:30 |
End Date |
27/01/2025 ( Expired 84 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 30 nos rcc isolation stoppings and 4 nos brick made isolation stopping at 11dip proposed depillaring panel in massan combined seam of shiwani ug mine.
Construction of 30 nos rcc isolation stoppings and 4 nos brick made isolation stopping at 11dip proposed depillaring panel in massan combined seam of shiwani ug mine.
Read moreTransportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area
Transportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area
Read moreShifting of 06 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments and shifting of main acb, coupled acb for proposed development and depillaring panels at seam vii and vi(b) khairaha ug mine
Shifting of 06 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments and shifting of main acb, coupled acb for proposed development and depillaring panels at seam vii and vi(b) khairaha ug mine
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreShifting of 04 nos. sub station including all accessories for depillaring of cm-4a, cm-4b and cm-5 pannel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Shifting of 04 nos. sub station including all accessories for depillaring of cm-4a, cm-4b and cm-5 pannel of l-1b seam at vindhya ug mine, pinoura sub area, johilla area
Read moreInstallation of gate belt (1000mm) for proposed development/dep. panel cm 6 and cm 7 (vii seam)at bangwar ug mine, sgp area
Installation of gate belt (1000mm) for proposed development/dep. panel cm 6 and cm 7 (vii seam)at bangwar ug mine, sgp area
Read moreComplete installation, testing and commissioning of vacuum circuit breaker 33 kv grade, 33kv control panel with ct and pt, 2 mva transformer, 33 kv/ 3.3kv, 3.3 kv indoor vcb panels at main sub-station of amadand ug mine
Complete installation, testing and commissioning of vacuum circuit breaker 33 kv grade, 33kv control panel with ct and pt, 2 mva transformer, 33 kv/ 3.3kv, 3.3 kv indoor vcb panels at main sub-station of amadand ug mine
Read moreConstruction of 48 nos rcc ventilation stoppings and repairing of 19 nos. of old ventilation stoppings in vi top seam for prop. cm depillaring panel c1 and c2 at bangwar ug mine
Construction of 48 nos rcc ventilation stoppings and repairing of 19 nos. of old ventilation stoppings in vi top seam for prop. cm depillaring panel c1 and c2 at bangwar ug mine
Read moreMaking of subsidence pillars over proposed depillaring panel no. 4j-7 and 4j-8 of 4a seam for monitoring and recording reading after subsided goaved out panels as per cmr-2017 for safety under mcp head of jhiria ug mine.
Making of subsidence pillars over proposed depillaring panel no. 4j-7 and 4j-8 of 4a seam for monitoring and recording reading after subsided goaved out panels as per cmr-2017 for safety under mcp head of jhiria ug mine.
Read moreInstallation of 1000mm belt conveyor in proposed depillaring panel 30ln (lhcm panel) in seam-a at kurja ug mine of hasdeo area
Installation of 1000mm belt conveyor in proposed depillaring panel 30ln (lhcm panel) in seam-a at kurja ug mine of hasdeo area
Read moreof your Industry type