Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Installation And Transportation Of Gate Belt(1000mm) From Vii Top Seam To Vi Top Seam For Next Cm Panel C1 And C2 At Bangwar Ug Mine.
|
| Description |
Dismantling, Installation And Transportation Of Gate Belt(1000mm) From Vii Top Seam To Vi Top Seam For Next Cm Panel C1 And C2 At Bangwar Ug Mine.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_321780_1 |
|
Reference Number |
SECL/SGP/SO(M)/e-T/35/24-2 5/671 Dt22.11.2024 |
| Tender Fee | 0 |
| EMD | 51500 |
| Tender Value | - |
| Place | Bangwar UG MIne |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333553 |
| Start Date | November 25, 2024 15:30 |
| End Date |
Expired
05/12/2024
Expired 679 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Read morePreparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Read moreConstruction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Construction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Read moreConstruction of permanent first aid station,cross over bridge in every 300m interval for safety cross the belt in v-top seam at baherabandh ug mine, hasdeo area.
Construction of permanent first aid station,cross over bridge in every 300m interval for safety cross the belt in v-top seam at baherabandh ug mine, hasdeo area.
Read moreCleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Cleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Read moreConstruction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Construction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Read moreConstruction of 52 nos. pcc ventilation stoppings in 16ls,10ls,-16r and -9r panel of seam c at kurja ug mine.
Construction of 52 nos. pcc ventilation stoppings in 16ls,10ls,-16r and -9r panel of seam c at kurja ug mine.
Read moreConstruction of side protection wall and construction of 245 nos. steps for cm panel of 10b seam at haldibari ug mine.
Construction of side protection wall and construction of 245 nos. steps for cm panel of 10b seam at haldibari ug mine.
Read moreDrivage of 1 no. underground vertical air shaft from seam-iii to seam-i to establish return airway system for vijay west ug mine at rani atari sub area
Drivage of 1 no. underground vertical air shaft from seam-iii to seam-i to establish return airway system for vijay west ug mine at rani atari sub area
Read moreWork of drivage of three 03 nos. of drifts to cross the faults in seamii top at vijay west ug mine
Work of drivage of three 03 nos. of drifts to cross the faults in seamii top at vijay west ug mine
Read moreof your Industry type