Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 48 Nos Rcc Ventilation Stoppings And Repairing Of 19 Nos. Of Old Ventilation Stoppings In Vi Top Seam For Prop. Cm Depillaring Panel C1 And C2 At Bangwar Ug Mine
|
| Description |
Construction Of 48 Nos Rcc Ventilation Stoppings And Repairing Of 19 Nos. Of Old Ventilation Stoppings In Vi Top Seam For Prop. Cm Depillaring Panel C1 And C2 At Bangwar Ug Mine
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_329600_1 |
|
Reference Number |
SECL/SGP/SO(M)/e-T/35/24-2 5/679 Dt019.02.2025 |
| Tender Fee | 0 |
| EMD | 58800 |
| Tender Value | |
| Place | Bangwar UG MIne |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341637 |
| Start Date | February 20, 2025 15:30 |
| End Date |
Expired
03/03/2025
Expired 466 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Design supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Read moreConstruction of 25 nos. rcc isolation stoppings in depillaring panel ( cm panel c1 and c2) in vi top seam at bangwar ug mne
Construction of 25 nos. rcc isolation stoppings in depillaring panel ( cm panel c1 and c2) in vi top seam at bangwar ug mne
Read moreConstruction of 28 nos. rcc ventilation stoppings in vii seam for prop. depillaring panel-cm-6 and cm-7 at bangwar ug mine
Construction of 28 nos. rcc ventilation stoppings in vii seam for prop. depillaring panel-cm-6 and cm-7 at bangwar ug mine
Read moreConstruction of 55 nos. rcc ventilation stoppings in vi top (combined) seam for proposed depillaring panel c3 and c4 at bangwar ug mine
Construction of 55 nos. rcc ventilation stoppings in vi top (combined) seam for proposed depillaring panel c3 and c4 at bangwar ug mine
Read moreConstruction of 39 nos. rcc isolation stoppings in proposed depillaring panel ( cm panel-c3 and c4) in vi top seam at bangwar ug mine
Construction of 39 nos. rcc isolation stoppings in proposed depillaring panel ( cm panel-c3 and c4) in vi top seam at bangwar ug mine
Read moreConstruction of 17 nos. rcc isolation stoppings in depillaring panel(cm panel 05) in vii seam at bangwar ug mine
Construction of 17 nos. rcc isolation stoppings in depillaring panel(cm panel 05) in vii seam at bangwar ug mine
Read moreConstruction of 17 nos rcc isolation stoppings in depillaring panel (cm panel 05) in vii seam at bangwar ug mine.
Construction of 17 nos rcc isolation stoppings in depillaring panel (cm panel 05) in vii seam at bangwar ug mine.
Read moreConstruction of 23 nos. rcc sectionalization stoppings in vi top seam at bangwar ug mine
Construction of 23 nos. rcc sectionalization stoppings in vi top seam at bangwar ug mine
Read moreRepairing of ventilation stoppings in vi bottom vi top and vii seam at bangwar ug mine of sohagpur area
Repairing of ventilation stoppings in vi bottom vi top and vii seam at bangwar ug mine of sohagpur area
Read moreDismantling, installation andtransportation of gate belt(1000mm) from vii top seam to vi top seam for next cm panel c1 and c2 at bangwar ug mine
Dismantling, installation andtransportation of gate belt(1000mm) from vii top seam to vi top seam for next cm panel c1 and c2 at bangwar ug mine
Read moreof your Industry type